G'day list,
We are having a response problem with an E/Cobol module that has just being
converted from COBII. It is called from an HLASM module not using LE.
Before the conversion the checkpoint were being taken at 20 seconds ( 500
deletes to the data base ( IMS ). Initial run took that to a
-8snip-
We are having a response problem with an E/Cobol module that has just being
converted from COBII. It is called from an HLASM module not using LE.
-8snip-
If I understand the problem correctly, this is possibly relevant
-Original Message-
From: Stocker, Herman [mailto:[EMAIL PROTECTED]
Sent: Tuesday, May 22, 2007 7:57 AM
To: IBM-MAIN@BAMA.UA.EDU
Subject: HLASM calling E/Cobol Response time problem
Snipped
We added PREINIT to the JCL this brought the checkpoint time down to 5
minutes.
What does
On 22 May 2007 04:57:02 -0700, in bit.listserv.ibm-main you wrote:
G'day list,
We are having a response problem with an E/Cobol module that has just being
converted from COBII. It is called from an HLASM module not using LE.
That is the problem. Change the Assembler caller to LE conforming
4 matches
Mail list logo