Re: Can a job determine its own WLM priority?

2018-05-25 Thread Allan Staller
I believe all of that type of information is available via WLM macros.

However, I also believe that any modification of WLM "settings" requires APF 
authorization.
It might even be true for inquiry type activities.

Check the WLM Planning Guide.

HTT,

-Original Message-
From: IBM Mainframe Discussion List [mailto:IBM-MAIN@LISTSERV.UA.EDU] On Behalf 
Of Phil Smith III
Sent: Thursday, May 24, 2018 5:55 PM
To: IBM-MAIN@LISTSERV.UA.EDU
Subject: Can a job determine its own WLM priority?

That is, can a job determine what its WLM priority is, and especially whether 
that changes as it runs?



Clearly the real answer is "yes", so this becomes a two-part question:

1) Is there a documented interface?

2) Are there undocumented interfaces?



Thanks.


--
For IBM-MAIN subscribe / signoff / archive access instructions, send email to 
lists...@listserv.ua.edu with the message: INFO IBM-MAIN
::DISCLAIMER::
--
The contents of this e-mail and any attachment(s) are confidential and intended 
for the named recipient(s) only. E-mail transmission is not guaranteed to be 
secure or error-free as information could be intercepted, corrupted, lost, 
destroyed, arrive late or incomplete, or may contain viruses in transmission. 
The e mail and its contents (with or without referred errors) shall therefore 
not attach any liability on the originator or HCL or its affiliates. Views or 
opinions, if any, presented in this email are solely those of the author and 
may not necessarily reflect the views or opinions of HCL or its affiliates. Any 
form of reproduction, dissemination, copying, disclosure, modification, 
distribution and / or publication of this message without the prior written 
consent of authorized representative of HCL is strictly prohibited. If you have 
received this email in error please delete it and notify the sender 
immediately. Before opening any email and/or attachments, please check them for 
viruses and other defects.
--

--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN


Re: Can a job determine its own WLM priority?

2018-05-25 Thread Horst Sinram
Phil,

there is no "WLM priority". There is a dispatch priority, and there is a WLM 
importance (and goal).
- Which one are you interested in? 
- Only for simple cases the entire "job" (address space) would be managed to 
the same service class period, and therefore dispatch priority. Are you 
definitively not interested in e.g. in enclave management?
- Is the "job" authorized?

Horst Sinram - STSM, IBM z/OS Workload and Capacity Management

--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN


Re: Can a job determine its own WLM priority?

2018-05-24 Thread Ed Jaffe

On 5/24/2018 3:54 PM, Phil Smith III wrote:

That is, can a job determine what its WLM priority is, and especially
whether that changes as it runs?

Clearly the real answer is "yes", so this becomes a two-part question:
1) Is there a documented interface?
2) Are there undocumented interfaces?


SYSEVENT REQASD or REQFASD provides your WLM information.

--
Phoenix Software International
Edward E. Jaffe
831 Parkview Drive North
El Segundo, CA 90245
http://www.phoenixsoftware.com/

This e-mail message, including any attachments, appended messages and the
information contained therein, is for the sole use of the intended
recipient(s). If you are not an intended recipient or have otherwise
received this email message in error, any use, dissemination, distribution,
review, storage or copying of this e-mail message and the information
contained therein is strictly prohibited. If you are not an intended
recipient, please contact the sender by reply e-mail and destroy all copies
of this email message and do not otherwise utilize or retain this email
message or any or all of the information contained therein. Although this
email message and any attachments or appended messages are believed to be
free of any virus or other defect that might affect any computer system into
which it is received and opened, it is the responsibility of the recipient
to ensure that it is virus free and no responsibility is accepted by the
sender for any loss or damage arising in any way from its opening or use.

--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN


Can a job determine its own WLM priority?

2018-05-24 Thread Phil Smith III
That is, can a job determine what its WLM priority is, and especially
whether that changes as it runs?

 

Clearly the real answer is "yes", so this becomes a two-part question:

1) Is there a documented interface?

2) Are there undocumented interfaces?

 

Thanks.


--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN