Re: [mpls] point 3 in... RE: Questions about draft-betts-itu-oam-ach-code-point

2012-01-13 Thread Loa Andersson
All (taking chair hat off), I agree with Ross's comments below that if the document is last called it should go through a wg last call (pwe3 and mpls) and through an IETF last call. I agree that these last calls could be in parallel is necessary, but I believe that running the wg last call

Re: [mpls] point 3 in... RE: Questions about draft-betts-itu-oam-ach-code-point

2012-01-13 Thread Andrew G. Malis
Also taking my chair hat off ... as Malcolm stated that G.8113.1 applies to PWs, and the requested allocation is in a registry that originated in the PWE3 working group, I agree that a PWE3 WG last call is warranted. This could certainly take place in parallel with the MPLS WG last call. Cheers,