Kenneth Knowles created BEAM-5779:
-------------------------------------

             Summary: Failure in beam_PostCommit_Python_Verify 
PubSubIntegrationTest on Dataflow
                 Key: BEAM-5779
                 URL: https://issues.apache.org/jira/browse/BEAM-5779
             Project: Beam
          Issue Type: Bug
          Components: sdk-py-core
            Reporter: Kenneth Knowles
            Assignee: Ahmet Altay


https://builds.apache.org/job/beam_PostCommit_Python_Verify/6296/

Path to failure:
* beam_PostCommit_Python_Verify
* test_streaming_data_only
* apache_beam.io.gcp.pubsub_integration_test.PubSubIntegrationTest

{code}
AssertionError: 
Expected: (Test pipeline expected terminated in state: RUNNING and Expected 2 
messages.)
     but: Expected 2 messages. Got 0 messages. Diffs (item, count):
  Expected but not in actual: [('data002-seen', 1), ('data001-seen', 1)]
  Unexpected: []
{code}

Looks like a legitimate failure. It is flakey as it went green later.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to