[ 
https://issues.apache.org/jira/browse/FLINK-29137?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Chesnay Schepler closed FLINK-29137.
------------------------------------
    Resolution: Fixed

dev-master: 47747fa25eeccbbea31c11b6a8bfe957c490a91c
dev-1.15: ff76f1e2d2facca7d0ae946e1547db16762e9150
dev-1.14: 19f876183bb888576ac309c10a9ae5fa880282e9

> Switch docker images to eclipse temurin base
> --------------------------------------------
>
>                 Key: FLINK-29137
>                 URL: https://issues.apache.org/jira/browse/FLINK-29137
>             Project: Flink
>          Issue Type: Technical Debt
>          Components: flink-docker
>            Reporter: Chesnay Schepler
>            Assignee: Chesnay Schepler
>            Priority: Major
>              Labels: pull-request-available
>
> The openjdk images have been deprecated, causing our images to be rejected 
> from, official-images; switch to Temurin.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to