[ 
https://issues.apache.org/jira/browse/FLINK-25036?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated FLINK-25036:
-----------------------------------
    Labels: pull-request-available  (was: )

> Introduce stage-wised scheduling strategy
> -----------------------------------------
>
>                 Key: FLINK-25036
>                 URL: https://issues.apache.org/jira/browse/FLINK-25036
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Coordination
>            Reporter: Lijie Wang
>            Assignee: Lijie Wang
>            Priority: Major
>              Labels: pull-request-available
>
> The scheduling of the adaptive batch job scheduler should be stage 
> granularity, because the information for deciding parallelism can only be 
> collected after the upstream stage is fully finished, so we need to introduce 
> a new scheduling strategy: Stage-wised Scheduling Strategy.



--
This message was sent by Atlassian Jira
(v8.20.1#820001)

Reply via email to