[ 
https://issues.apache.org/jira/browse/FLINK-14284?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated FLINK-14284:
-----------------------------------
    Labels: pull-request-available  (was: )

> Add shut down future to Dispatcher
> ----------------------------------
>
>                 Key: FLINK-14284
>                 URL: https://issues.apache.org/jira/browse/FLINK-14284
>             Project: Flink
>          Issue Type: Improvement
>          Components: Runtime / Coordination
>    Affects Versions: 1.10.0
>            Reporter: Till Rohrmann
>            Assignee: Till Rohrmann
>            Priority: Minor
>              Labels: pull-request-available
>             Fix For: 1.10.0
>
>
> In order to better integrate with the {{DispatcherRunner}}, all 
> {{Dispatchers}} should report their final application status via a shut down 
> future (see FLINK-14281). Therefore, I propose to a shut down future to the 
> {{Dispatcher}}.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to