https://issues.apache.org/jira/browse/HIVE-19425?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Vihang Karajgaonkar reassigned HIVE-19425:
------------------------------------------


> General usability improvements for Ptest
> ----------------------------------------
>
>                 Key: HIVE-19425
>                 URL: https://issues.apache.org/jira/browse/HIVE-19425
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Vihang Karajgaonkar
>            Assignee: Vihang Karajgaonkar
>            Priority: Major
>
> The Ptest framework has a lot of usability issues some of which are listed 
> below:
> 1. Ptest can run only one job at a time.
> 2. The pending queue resides on the pre-commit jenkins server. If the jenkins 
> server is restarted we lose the queue and the devs don't understand why their 
> patches were not run.
> 3. Average Ptest run takes about ~100 min which not bad considering it is 
> running > 10k tests; many of which are very complex queries. We should look 
> to see if we can further reduce the turn-around time.
> Some of the ideas to improve the current state of Ptest could be:
> 1. Move the queue to the Ptest server so that it is not lost due to jenkins 
> restarts.
> 2. The jenkins server could do some useful work instead of just waiting for 
> Ptest server to return. I propose it should run some pre-checkin (for lack of 
> a better word) tests which are reliable and which run fast. The advantage of 
> having pre-checkin tests if there are issues with the patch, the pre-commit 
> fails fast without the long turn-around time and devs will get a quick 
> feedback on issues which need to be fixed in the patch before the full suite 
> of tests need to be run. The second advantage is Ptest server will be running 
> a fairly tested patches so hopefully will be doing useful work rather. This 
> would also reduce load on the Ptest.
> 3. If Ptest server has a database we can do interesting analysis on the test 
> results like identifying flaky tests automatically, generating weekly reports 
> about the test status.
> 4. Have a web-interface of the Ptest server so that devs can check the status 
> of the queue and which patch is being run currently.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to