[ https://issues.apache.org/jira/browse/MESOS-9805?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16852665#comment-16852665 ]
James Peach commented on MESOS-9805: ------------------------------------ /cc [~gilbert], [~jieyu] [~qianzhang] > Run cgroup subsystems before moving the target PID. > --------------------------------------------------- > > Key: MESOS-9805 > URL: https://issues.apache.org/jira/browse/MESOS-9805 > Project: Mesos > Issue Type: Improvement > Components: containerization > Reporter: James Peach > Priority: Major > > Currently, the Pid targeted by the cgroups isolator is moved into the cgroup > before the subsystem runs to apply any type-specific cgroup configuration. We > should reverse the order of this so that the PID is only moved once the > cgroup is fully configured by the subsystem. > The specific use case that affected us was where a PID was assigned to a > {{net_cls}} cgroup before that cgroup had the class ID set. This caused a > separate system to become confused. -- This message was sent by Atlassian JIRA (v7.6.3#76005)