[jira] [Updated] (IGNITE-12076) Optimistic transaction initiated from client node and parallel cache stop may lead to node hang on the final phase of PME.

2019-08-22 Thread Vyacheslav Koptilin (Jira)
[ https://issues.apache.org/jira/browse/IGNITE-12076?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Vyacheslav Koptilin updated IGNITE-12076: - Reviewer: Ivan Rakov > Optimistic transaction initiated from client node and

[jira] [Updated] (IGNITE-12076) Optimistic transaction initiated from client node and parallel cache stop may lead to node hang on the final phase of PME.

2019-08-15 Thread Vyacheslav Koptilin (JIRA)
[ https://issues.apache.org/jira/browse/IGNITE-12076?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Vyacheslav Koptilin updated IGNITE-12076: - Description: It looks like the mentioned behavior was introduced by