[ https://issues.apache.org/jira/browse/SUREFIRE-1213?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Tibor Digana updated SUREFIRE-1213: ----------------------------------- Fix Version/s: (was: 3.0-RC1) Backlog > MOJO pre-integration-test and post-integration-test > --------------------------------------------------- > > Key: SUREFIRE-1213 > URL: https://issues.apache.org/jira/browse/SUREFIRE-1213 > Project: Maven Surefire > Issue Type: New Feature > Components: Maven Failsafe Plugin > Reporter: Tibor Digana > Assignee: Tibor Digana > Priority: Major > Fix For: Backlog > > > Introduce MOJO phase pre-integration-test and post-integration-test. > Introduce JSR 223 miscellaneous scriptables (BashShell, JavaScript, Nashorn). > The goal is to run environment setup and cleanup before/after integration > tests. > For the sake of Surefire build already requires JDK 6 (javac 1.5 still used) > these two MOJOs will be added as experimental implementations of Surefire 3.0 > which will be built on the top of Java 1.6. -- This message was sent by Atlassian JIRA (v7.6.3#76005)