Hello everyone.
As mentioned in my previous report, the next step was to implement UNO
interface for Data Providers .
Reason for not sending report last week was I started learning about UNO
and there was no specific achievement . I informed about this to Markus
also.
So last 2 weeks were full
Hi,
Here is the week 6 Report:
* Worked on patch [1] which was pushed to remote this week
+ Implemented InitGalleryTheme() and DestroyGalleryTheme() to handle
the lifecycle of SotStorage object
* Removed long chains from the code I wrote
+ e.g.,
Hello,
I want to share with you the progress of this week.
Last Week Week:
- Better thread structure
- Search implementation
This Week TODO:
- Tags Implementation
- Page system implementation to the extension list
- Better API Parameter structure implementation
Thanks to my mentors. (Muhammet
Hello,
Last week, I worked on emoji control.
https://gerrit.libreoffice.org/#/c/26700/
I implemented the toolbox control and insertion in the doc.
I also worked on the template manager.
https://gerrit.libreoffice.org/#/c/26890/
This week.. I'll continue with the emoji control project.
Hi,
Last week, I completed the new preset listbox widget and sent in commits
for redesigning hatch and gradient tab.
1. Hatch tab - http://imgur.com/88IYimV
2. Gradient tab - http://imgur.com/3hKan1k
Bitmap tab is complete but requires minor UI tweaks -
Dear Community,
During the 6th week, I finished integrating commonsallayout in windows
code path.
Integrating with quartz/ is left.
This week my schedule has been disturbed slightly due to my summer
vacations ending and going back to college. But I intend to make it up
in the weekend
Regards,
Hello everyone
This week I've been working on the import of the text insertion and
deletion changes.
There is an issue while referring to a change since in writer the elements
exist as a hierarchical structure of nodes whereas according to the MCT
proposal we need to number the paragraphs as