On 5/24/07, huijun lu <[EMAIL PROTECTED]> wrote:
I know the CRM can do much as I think, but CRM is too complex for me.
Now I have 8 processes from heartbeat if I use serial cable and mcast
eth1 for heartbeat. But if I set CRM on, then 9 more processes start.
Is it possible for me to simplify the
Hi,everybody,
I've studied heartbeat for several weeks, and found it has perfect and
overall functions. But it is a little big for me.
System description: Two node, Redhat EL4, heartbeat-2.0.8,
same hardware and software configure, same processes running, but
different behavior(active node rece