Le 14/05/2018 à 10:27, Philippe Bergheaud a écrit :
Failure to synchronize the tunneled operations does not prevent
the initialization of the cxl card. This patch reports the tunneled
operations status via /sys.
Signed-off-by: Philippe Bergheaud
---
Thanks for adding
Failure to synchronize the tunneled operations does not prevent
the initialization of the cxl card. This patch reports the tunneled
operations status via /sys.
Signed-off-by: Philippe Bergheaud
---
v3: Added this patch to report the tunneled operations status.
v4: Updated