[LUAU] Has anyone spec'ed a small data center generator before?

2010-11-08 Thread Brian Chee
So I¹m looking at exploring the potential for a small (approx 20kw) generator to get past long (more than 20 minutes) power outages for critical servers. Does anyone have some wisdom they can share with me? /brian chee -- Brian Chee University of Hawai'i at Manoa School of Ocean and Earth

Re: [LUAU] Has anyone spec'ed a small data center generator before?

2010-11-08 Thread John Call
Are you factoring in for the auto-transfer switch and electrical contact work as well? I'm doing an 80kW presently... John Sent from my Samsung Epic™ 4G Brian Chee c...@hawaii.edu wrote: So I¹m looking at exploring the potential for a small (approx 20kw) generator to get past long (more

Re: [LUAU] Has anyone spec'ed a small data center generator before?

2010-11-08 Thread Brian Chee
Yup...transfer switches, etc are going to be VERY important and my current thought is to utilize the science logic scripting system to force certain things to happen in a particular order...like wait time for generator to stabilize instead of instant switch over. /brian chee On 11/8/10 1:45

Re: [LUAU] Has anyone spec'ed a small data center generator before?

2010-11-08 Thread Al Plant
Brian Chee wrote: So I¹m looking at exploring the potential for a small (approx 20kw) generator to get past long (more than 20 minutes) power outages for critical servers. Does anyone have some wisdom they can share with me? /brian chee # Aloha Brian, I have two stationary