So I¹m looking at exploring the potential for a small (approx 20kw)
generator to get past long (more than 20 minutes) power outages for critical
servers. Does anyone have some wisdom they can share with me?
/brian chee
--
Brian Chee
University of Hawai'i at Manoa
School of Ocean and Earth
Are you factoring in for the auto-transfer switch and electrical contact work
as well? I'm doing an 80kW presently...
John
Sent from my Samsung Epic™ 4G
Brian Chee c...@hawaii.edu wrote:
So I¹m looking at exploring the potential for a small (approx 20kw)
generator to get past long (more
Yup...transfer switches, etc are going to be VERY important and my current
thought is to utilize the science logic scripting system to force certain
things to happen in a particular order...like wait time for generator to
stabilize instead of instant switch over.
/brian chee
On 11/8/10 1:45
Brian Chee wrote:
So I¹m looking at exploring the potential for a small (approx 20kw)
generator to get past long (more than 20 minutes) power outages for critical
servers. Does anyone have some wisdom they can share with me?
/brian chee
#
Aloha Brian,
I have two stationary