load reduction in continuation power flow (CPF)

2017-02-15 Thread Majid Mehdizadeh
Dear sir and matpower committee It is very strange for me that when the load of some PQ buses in IEEE 39 bus test system are reduced and then cpf is performed then the load margin of the system is becoming lower . It should be noted that i use the following code to estimate the load margin of the

MATPOWER

2017-02-15 Thread Akash Tyagi
hello sir, what is the role of termination tolerance (pf.tol) on per unit P and Q dispatch? & what is the function of ext2int and int2ext function? and how do we use these function ?

Re:

2017-02-15 Thread Ray Zimmerman
I’m not sure, but the offer/bid data does not seem consistent with case118, which does not have any dispatchable loads and therefore should not have any bids, only offers. Ray > On Feb 9, 2017, at 8:26 AM, Ammar Raza wrote: > > > Hi > > This is Case118. And I am