KG01 - see comments inline.
On Jul 21, 2012, at 12:07 PM, Shenfeng Liu liush...@gmail.com wrote:
Kevin,
Good suggestion!
Maybe we can use the Priority field together with the Target Miletone
field. e.g. For an item we propose to 3.5, we set Target Milestone to AOO
3.5, then setup
Simon,
I have several questions:
1) we should define feature development and defects fixed plan in one
iteration, right? it can help developer and tester finish their task in one
iteration. if we need have iteration development plan review?
2)if QE reports severity 1 2 defects, if they all must be
Kevin,
Please see my comments below. Thanks!
- Simon
2012/7/25 Kevin Grignon kevingrignon...@gmail.com
KG01 - see comments inline.
On Jul 21, 2012, at 12:07 PM, Shenfeng Liu liush...@gmail.com wrote:
Kevin,
Good suggestion!
Maybe we can use the Priority field together with the
Xue Fei,
Ideally, I want to answer yes to your question 1 2, and define the
Target Milestone to not only 3.5.0, but also to the level of 3.5.0M1,
3.5.0M2... And ask people to input their plan. However I'm not sure if it
will be too strict for volunteers to do the contribution. Another way can
I add some items for Calc application for 3.5 plan in 3.5 Release Planning
wiki
https://cwiki.apache.org/confluence/display/OOOUSERS/AOO+3.5+Release+Planning
If there are anything which must be in 3.5 for Calc, please discuss it here
or put it in the list in the planning wiki.
On Fri, Jul 20,
Wang Lei,
The proposed items look very good! And you can create issues and setting
Issue Type as ENHANCEMENT or FEATURE in BZ if they did not exist, then fill
the Task-ID in wiki. Thanks very much for your input!
- Simon
2012/7/20 Lei Wang l...@apache.org
I add some items for Calc
KG01 - See comments inline.
On Jul 20, 2012, at 4:59 PM, Shenfeng Liu liush...@gmail.com wrote:
Wang Lei,
The proposed items look very good! And you can create issues and setting
Issue Type as ENHANCEMENT or FEATURE in BZ if they did not exist, then fill
the Task-ID in wiki. Thanks very
Kevin,
Good suggestion!
Maybe we can use the Priority field together with the Target Miletone
field. e.g. For an item we propose to 3.5, we set Target Milestone to AOO
3.5, then setup Priority to: P1 for must have, P2 for should have, P3 for
better to have... ?
- Simon
2012/7/20 Kevin
Juergen,
Thanks for your comments!
My thoughts below...
And I updated the 3.5 Release Planning
wikihttps://cwiki.apache.org/confluence/display/OOOUSERS/AOO+3.5+Release+Planningwith
a draft of the defect/feature rule. Could you and QE team review and
give comments?
Again, it is not only
Hi, all,
I made some update on the AOO 3.5 Release Planning wiki Juergen created:
https://cwiki.apache.org/confluence/display/OOOUSERS/AOO+3.5+Release+Planning.
And besides proposing contents in the High Level Overview table, I think
we should also think about the release process. And below
On 7/18/12 9:02 AM, Shenfeng Liu wrote:
Hi, all,
I made some update on the AOO 3.5 Release Planning wiki Juergen created:
https://cwiki.apache.org/confluence/display/OOOUSERS/AOO+3.5+Release+Planning.
And besides proposing contents in the High Level Overview table, I think
we should