Re: [OPEN-ILS-DEV] Evergreen 2.2 RC1 fresh install questions

2012-05-24 Thread Lazar, Alexey Vladimirovich
In the Evergreen 2.2 RC1 I just installed, how do I enable TPAC by default? Would that be a good idea at this point, or is it too early? To clarify my own words, is TPAC stable and tested well enough for a production environment? Alexey Lazar PALS Information System Developer and Integrator

Re: [OPEN-ILS-DEV] Evergreen 2.2 RC1 fresh install questions

2012-05-24 Thread Ben Shum
For 2.2, the goal was to replace the original slimpac (simple OPAC) with Tpac and it is there now as the simple catalog. However, there is still ongoing work to further enhance and refine various aspects and add features to Tpac before it will fully replace the JSPac. The projected time

Re: [OPEN-ILS-DEV] Evergreen 2.2 RC1 fresh install questions

2012-05-24 Thread Lazar, Alexey Vladimirovich
Hi, Justin. I uncommented this whole section, including the line you mentioned: LocationMatch ^/$ SetHandler perl-script PerlHandler OpenILS::WWW::Redirect Options +ExecCGI PerlSendHeader On #PerlSetVar OILSRedirectSkin default # OILSRedirectDepth defaults to the depth of

Re: [OPEN-ILS-DEV] Evergreen 2.2 RC1 and the 2.2 RC1 staff client

2012-05-24 Thread Anoop Atre
This is actually a clarification I've been meaning to suggest to the install documentation. It should say make STAFF_CLIENT_STAMP_ID=rel_2_2_rc1 install since the client we provide looks for that stamp. A quick fix is to cd /openils/var/web/xul and then ln -sf rel_2_2 rel_2_2_rc1. Cheers On

Re: [OPEN-ILS-DEV] Internationalization support in Evergreen

2012-05-24 Thread Dan Scott
On Thu, May 24, 2012 at 02:53:28PM +, Duimovich, George wrote: Hello Dan / Lebbeous, Regarding the GSOC proposal on Overhauling internationalization support in Evergreen here: http://evergreen-ils.org/dokuwiki/doku.php?id=dev:summer_of_coding_ideas Are there any examples in the

[OPEN-ILS-DEV] Should GSOC schedule affect 2.3 (etc) release schedule?

2012-05-24 Thread Bill Erickson
Hi all, While discussing the proposed 2.3 release schedule (below) in the IRC dev meeting yesterday, Jeff pointed out that the GSOC code-complete deadline of Aug. 13 will likely put most/all of the GSOC code out of the running for inclusion in Evergreen 2.3 (using the proposed schedule). The

Re: [OPEN-ILS-DEV] Should GSOC schedule affect 2.3 (etc) release schedule?

2012-05-24 Thread Dan Scott
On May 24, 2012 12:19 PM, Lazar, Alexey Vladimirovich alexey.la...@mnsu.edu wrote: Generally, I think all contributed code should go through the equal review procedures and not specially prioritized, unless we are talking about critical fixes, but can be decided on a case-by-case basis or

Re: [OPEN-ILS-DEV] Should GSOC schedule affect 2.3 (etc) release schedule?

2012-05-24 Thread Bill Erickson
On Thu, May 24, 2012 at 12:28:08PM -0400, Dan Scott wrote: On May 24, 2012 12:19 PM, Lazar, Alexey Vladimirovich alexey.la...@mnsu.edu wrote: Generally, I think all contributed code should go through the equal review procedures and not specially prioritized, unless we are talking about

Re: [OPEN-ILS-DEV] Should GSOC schedule affect 2.3 (etc) release schedule?

2012-05-24 Thread Galen Charlton
Hi, On May 24, 2012, at 4:35 PM, Bill Erickson wrote: IIRC, there was a +1 from Galen in IRC as well. Given the lack of objection, I'll consider this case closed. The release schedule stands. Confirmed... +1 Regards, Galen -- Galen Charlton Director of Support and Implementation Equinox