Current Dev Position: YP 3.3 M2 development

Next Deadline: 18th January 2021 YP 3.3 M2 build 

 

Next Team Meetings:

*       Bug Triage meeting Thursday Jan. 14th at 7:30am PDT (
<https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09>
https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*       Monthly Project Meeting Tuesday Feb. 2nd at 8am PDT (
<https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09>
https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09
<https://zoom.us/j/990892712> )
*       Weekly Engineering Sync Tuesday Jan. 12th at 8am PDT (
<https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09>
https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09
<https://zoom.us/j/990892712> )
*       Twitch -  See https://www.twitch.tv/theyoctojester

 

Key Status/Updates:

*       Patches for 3.3 M2 development are being tested and merged. We have
one week left before M2 is due to be built.
*       It was a mixed week for builds and patches, several reproducibility
issues appeared and issues also appeared after patches had merged in the
second or third build after that due to state reuse and differences between
worker distros. This makes merging the patches challenging.
*       In particular, an upgrade to qemu 5.2.0 did merge. That upgrade
includes a change to the underlying build system and the patchset was
significantly rationalised which may cause issues. In particular, issues on
centos hosts were eventually traced to the mmap_min_addr setting being too
low (65536 now seems to be the useful minimum).
*       We are now tracking intermittent ptest failures and a number of bugs
have been opened for these, we don't as yet have people able to work on them
though.
*       CVE metrics are starting to trend down again but we still have 56
"open" CVEs against master and more in gatesgath/dunfell so help in further
reducing the number would be appreciated.
*       Intermittent autobuilder issues continue to occur and with more
invasive changes and higher rebuild rates, the numbers are increasing again.
You can see the list of failures we're continuing to see by searching for
the "AB-INT" tag in bugzilla:
<https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT>
https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT

 

Ways to contribute:

*       There are bugs identified as possible for newcomers to the project:
<https://wiki.yoctoproject.org/wiki/Newcomers>
https://wiki.yoctoproject.org/wiki/Newcomers
*       There are bugs that are currently unassigned for YP 3.3. See:
<https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enha
ncements.2FBugs>
https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enhan
cements.2FBugs
*       We'd welcome new maintainers for recipes in OE-Core. Please see the
list at:
<http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/mai
ntainers.inc>
http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/main
tainers.inc and discuss with the existing maintainer, or ask on the OE-Core
mailing list. We will likely move a chunk of these to "Unassigned" soon to
help facilitate this.

 

YP 3.3 Milestone Dates:

*       YP 3.3 M2 build date 2021/01/18
*       YP 3.3 M2 Release date 2021/01/29
*       YP 3.3 M3 build date 2021/03/01
*       YP 3.3 M3 Release date 2021/03/12
*       YP 3.3 M4 build date 2021/04/05
*       YP 3.3 M4 Release date 2021/04/30

 

Planned upcoming dot releases:

*       YP 3.1.5 build date 2021/01/11
*       YP 3.1.5 release date 2021/01/22
*       YP 3.2.2 build date 2021/02/08
*       YP 3.2.2 release date 2021/02/19
*       YP 3.1.6 build date 2021/02/22
*       YP 3.1.6 release date 2021/03/05
*       YP 3.1.7 build date 2021/03/22
*       YP 3.1.7 release date 2021/04/02

 

Tracking Metrics:

*       WDD 2587 (last week 2598) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
*       Poky Patch Metrics  

*       Total patches found: 1298 (last week 1311)
*       Patches in the Pending State: 503 (39%) [last week 507 (39%)]

 

The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:

 <https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC

 

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Program Manager

*    Cell:                (208) 244-4460

* Email:              sjolley.yp...@gmail.com
<mailto:sjolley.yp...@gmail.com> 

 

-=-=-=-=-=-=-=-=-=-=-=-
Links: You receive all messages sent to this group.
View/Reply Online (#146617): 
https://lists.openembedded.org/g/openembedded-core/message/146617
Mute This Topic: https://lists.openembedded.org/mt/79625811/21656
Group Owner: openembedded-core+ow...@lists.openembedded.org
Unsubscribe: https://lists.openembedded.org/g/openembedded-core/unsub 
[arch...@mail-archive.com]
-=-=-=-=-=-=-=-=-=-=-=-

Reply via email to