On Sat, Jan 15, 2011 at 9:25 AM, Greg Smith g...@2ndquadrant.com wrote:
I'm going to share it before someone announces a deadline has passed or
something. (whistling)
Speaking of that, it is now Saturday, January 15, 2011 and CommitFest
2011-01 is now in progress. If you have any patches that
On Jan 15, 2011, at 6:50 AM, Robert Haas wrote:
It is really already too late for us to be seriously considering
integrating sync rep into 9.1. It will lead to another enormous beta
period during which the tree will be closed to new patches and
everyone will complain, or else we'll open the
On Sat, Jan 15, 2011 at 1:59 PM, David E. Wheeler da...@kineticode.com wrote:
On Jan 15, 2011, at 6:50 AM, Robert Haas wrote:
It is really already too late for us to be seriously considering
integrating sync rep into 9.1. It will lead to another enormous beta
period during which the tree will
On 1/15/11 6:50 AM, Robert Haas wrote:
It is really already too late for us to be seriously considering
integrating sync rep into 9.1. It will lead to another enormous beta
period during which the tree will be closed to new patches and
everyone will complain, or else we'll open the tree for