Benchmarking other Utilities:
1) Do you use a passive monitor similar to GEM5/PM7 when issuing and terminating TLD/OSL use for personnel RCA Access? a. Do you use a passive monitor for Entry(Issuing TLD/OSL)? Yes /No b. Do you use a passive monitor for Exit (permanently leaving site and removal of TLD/OSL use)? Yes/No c. Is there any process or controls put in place to ensure notification when they leave permanently when a passive monitor is used (if so, what is the method used)? 2) Do you remove RCA access (contactors or Utility personnel) at your facility when performing short term duties at other Nuclear facilities (e.g., Benchmarking, Assessments, outage support,) or short term medical leave, military duty? We have contractors (e.g., engineering contract personnel working out of Dallas) that periodically come on-site). Michael Macho Radiation Protection Supervisor [cid:image002.png@01D20E91.469A74A0] Luminant Power Comanche Peak Nuclear Power Plant 6322 North FM 56 or PO Box 1002 Mail Code 005A Glen Rose, TX 76043 (254)897-5698