Jira (FACT-1027) Is the code ready for release?

2015-06-19 Thread Kylo Ginsberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kylo Ginsberg commented on  FACT-1027 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Is the code ready for release?  
 
 
 
 
 
 
 
 
 
 
Yep, everything is in and CI is green. Woot 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.3.15#6346-sha1:dbc023d) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Puppet Bugs group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (FACT-1027) Is the code ready for release?

2015-06-11 Thread Kurt Wall (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kurt Wall updated an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 Facter /  FACT-1027 
 
 
 
  Is the code ready for release?  
 
 
 
 
 
 
 
 
 

Change By:
 
 Kurt Wall 
 
 
 

QA Risk Assessment:
 
 Low 
 
 
 

QA Risk Assessment Reason:
 
 N/Aforreleasetickets 
 
 
 

QA Status:
 
 Reviewed 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.3.15#6346-sha1:dbc023d) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Puppet Bugs group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (FACT-1027) Is the code ready for release?

2015-06-09 Thread Kylo Ginsberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kylo Ginsberg created an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 Facter /  FACT-1027 
 
 
 
  Is the code ready for release?  
 
 
 
 
 
 
 
 
 

Issue Type:
 
  Sub-task 
 
 
 

Assignee:
 
 Kylo Ginsberg 
 
 
 

Created:
 

 2015/06/09 3:29 PM 
 
 
 

Priority:
 
  Normal 
 
 
 

Reporter:
 
 Kylo Ginsberg 
 
 
 
 
 
 
 
 
 
 
If there are any version dependencies expressed in the code base, make sure these are up to date. For Puppet, make sure the shas used to build the MSI are correct. For Puppet-Server, make sure all references to the puppet version are correct. 
All tests (spec, acceptance) should be passing on all platforms for both stable  master. 
 

If a new platform has been added, make sure that platform has acceptance testing, new features have decent coverage, etc. etc.
 

If the release is going to be cut from a sha, rather than the head of a branch, make sure that sha specifically has gone through spec/acceptance/etc. tests
 

Move all items that should be moved from Ready for CI to Ready for Review
 
 
Have all tickets been resolved (passed Functional Review)? If not please add any missing tickets to the current sprint's board. 
https://tickets.puppetlabs.com/issues/?jql=project%20%3D%20FACT%20AND%20resolution%20%3D%20Unresolved%20AND%20fixVersion%20%3D%20%223.0.0%22