Hi Wrenches -
Occasionally we will do supply side connection for our PV systems. As of
1/1/2023 in CA, we follow the 2020 NEC 705.11 Supply-Side Source
Connections section. Recently, an inspector asked us to comply with the
following:
230.46 Spliced and Tapped Conductors
Service-entrance conducto
There are quite a few utility grade submeters out there. Leviton is one,
and here is a link:
https://www.leviton.com/en/products/commercial/submetering/submeters#t=Products&sort=%40wcs_site_tree_rank%20ascending&layout=card
Usually a utility will not let you distribute renewable energy to more
2 matches
Mail list logo