or
even residential clients? We happy to take on design and engineering in
house we just want to use the racking equipment.
Thanks
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 Ext. 500 (office)
707-206-5088 (Cell
forgot to include the link to the GS batteries.
http://www.gsbattery.com/PDFs/SLR1000-2.pdf
Thank you Steve for the information on the construction of the batteries
and how that affects cycle life.
Cheers-
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923
]
or Full river DC400-6
http://www.fullriverbattery.com/product/batteries/DC400-6
[image: Inline image 1]
What am i missing or how do they do this?
thanks
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 Ext. 500 (office)
707-206-5088 (Cell
as well as that is likely a problem if not now, then soon.
Good luck
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 Ext. 500 (office)
707-206-5088 (Cell)
On Wed, Dec 6, 2017 at 12:45 PM, b...@midnitesolar.com <b...@midnitesolar.com>
wrote:
>
&
need to
up size wire or swap out the meter socket?
problem with up sizing the wire is we ran 1/2 conduit so we can only go up
to #10. without overfilling or replacing the conduit run.
Hoping there is experience out there that can point me to a simple
solution.
Thanks
Daniel Tittmann
CTO
Greenwired
Just had a client with a 20 + yr old top loader tripping the 30 amp input
breaker on a magnum 2012 even when running a 10 K generator. Lock rotor
current on these old beasts can be a real issue, and it got worse over
time.
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
Turns out the roof is Corten not copper anyone with experience using brass
clips with Corten or do we need to go SS?
Thanks for the input.
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
On Tue, Aug 9, 2016 at 3:54 PM
?
Thanks
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & sett
of
the controller and not over to the series string rating and voltage
tolerance of the modules but from a production standpoint where does this
land?
thanks for your advice
Cheers-
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell
I'm with Jay on this one, We left the 9300's when we found Sun pumps. But
there is nothing like the stainless steal SQ flex.
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
On Thu, Jun 2, 2016 at 6:20 PM, Jay <jay.pe...@gmail.
.
Cheers-
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
On Tue, Apr 19, 2016 at 5:35 PM, jay <jay.pe...@gmail.com> wrote:
> I’d put my money on the batteries are getting really bad.
> The easiest “fix” is t
suspicious and does point to some sort of environmental /
installation reason.
just wanted to outline the full story as I was not trying to sling mud,
just trying to share our experience.
cheers-
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (offic
for the power to go?
I know this is vague, but I am searching the hive to see if there is a
better way to make these customers happy and make the sale.
Thanks
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell
from their SLD it looks like grid support as there is no transfer switch.
this will probably change as they continue to develop the product.
https://enphase.com/sites/default/files/AC_Battery_Brochure_NA_web.pdf
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923
thanks all for the thoughts. Ended up replacing all breakers and the
controller and the problem has gone away. sent the controller back to
midnite and came back with no issues so we are assuming it was the breaker.
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923
with under 10 mins of hold time are very lucky.
Obviously I have a lot of built up frustration with this company.
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
On Tue, Dec 15, 2015 at 4:01 PM, Starlight Solar Power Systems <
racking for framless modules is also not fun. they can relay only be
racked in landscape. they are also super heavy.
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
On Mon, Nov 16, 2015 at 5:28 AM, Jason Szumlanski <
and a new
controller. Is there anything else that I should replace?
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
On Thu, Oct 29, 2015 at 4:19 PM, b...@midnitesolar.com <b...@midnitesolar.com>
wrote:
>
> La
as usual this system is 2 Hrs from the shop with no cell
or internet coverage.
Thanks for your input.
Cheers-
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.com
dan...@greenwired.com
707-923-2001 (office)
707-206-5088 (Cell)
On Mon, Oct 26, 2015 at 10:25 PM, Mac Lewis <maclew...@gmail.com>
tly to the battery + terminal as opposed to the battery + bus bar in
the inverter panel still didn't solve the problem.
I cant figure out if it the classic causing the issue or if it is the
inverters and the AGS.
Any input would be appreciated.
Thanks
Daniel
Daniel Tittmann
CTO
Greenwired
www.greenwired.
20 matches
Mail list logo