*Position: Peoplesoft Trainer*

*Location: Manhattan, Kansas*

*Duration: 3 Months*

*
*

*Consulting for the PeopleSoft Campus Solutions Student System upgrade to
version 9.0.*

* *

*Project Background *

Our client implemented PeopleSoft Campus Solutions (CS) Student System
version 8.9 during academic year 2008-2009.

In 2009, Client conducted a detailed fit/gap analysis to prepare for the
upgrade to CS version 9.0. Client kicked off the CS version 9.0 upgrade
project in March 2010 with a target completion date of November 2010. Client
also plans to upgrade PeopleTools (PT) from version 8.49 to 8.50
concurrently with the CS version 9.0 upgrade.

The following CS modules are in production:

• Campus Community • Admissions • Student Record • Self Service • Student
Financials • Financial Aid





Provide consulting/ training for Client’s Upgrade Project Team “the team” to
ensure a successful upgrade to CS 9.0 and PT 8.50.



Deliverables:



*Training:*

a) Contractor will provide training on the following topics:

1) PeopleSoft PeopleCode Release 8.5 (5 days)

2) PeopleSoft PeopleTools 8.48 to 8.5 Delta (2 days)

b) Training should be conducted at K-State’s main campus in Manhattan,
Kansas and accommodate up to 12 students per day per course, unless the
parties agree that an alternative method would be as effective.

c) Training delivery method should be lab-based with hands-on interactive
exercises unless the parties agree that an alternative method would be as
effective.

d) Trainer must be willing and able to adjust course content and speed of
delivery to accommodate different learning styles and abilities.

e) One day prior to the start of each class Contractor will verify that the
software on the workstations and server(s) has been set up correctly, and
any outstanding issue(s) have been resolved. Any unresolved software-related
issue(s) after the start of class may result in a reduction of fees paid for
that course.

f) Contractor will provide the following for each course:

1. A brief description of expected outcomes, course pre-requisites,
curriculum outline, and materials to be provided for each course

2. Labor to conduct the course

3. All training materials, including lab exercises and reference books

4. Software and associated licenses, above the operating system level,
required to conduct each course

5. A fully configured virtual machine that will operate under the K-State
hosted environment, e.g., VMWare, Microsoft Virtual PC, etc.

6. The Virtual Machine (VM) software.

7. Labor to copy the virtual machine to the 12 computer workstations and to
server(s) if needed

8. A copy of the sign-in sheet for each day of each course

9. A list of students who successfully complete each course

10. A certificate of completion for each student

11. A copy of student evaluations for each course



Required:

• Minimum of three (3) years consulting experience in higher education
environment

• Consulting at different institutions

• At least one (1) consulting engagement with a U.S. institution of
comparable size to State University (23,000 students)

• Experience with and evidence of working functional knowledge of upgrading
Campus Solutions from PeopleSoft version 8.9 to version 9.0.

• Experience with and evidence of working functional knowledge of upgrading
from PeopleSoft PeopleTools version 8.48 to version 8.50.

• Preference will be given to individuals who have participated in a full
upgrade of Campus Solutions

• An emphasis in experience with functional project planning, not technical,
expertise


-- 
Justin Joshi |Solomons International (Formerly BusinEssence Solutions)|
Fax:(215)-565-2509|
www. SolomonsInternational.com|

-- 
You received this message because you are subscribed to the Google Groups 
"REQSRESUMES" group.
To post to this group, send email to reqsresu...@googlegroups.com.
To unsubscribe from this group, send email to 
reqsresumes+unsubscr...@googlegroups.com.
For more options, visit this group at 
http://groups.google.com/group/reqsresumes?hl=en.

Reply via email to