Hi,
You are going to change only priority without changing other flow fields,
right?
IIRC, you need to install a new flow with a new priority, then delete the
old one. Because the OpenFlow Spec says the priority field is one of the
key fields to identify the flows to modify so the priority field
Hi.
I tried several ways to change the priority of an existing flow but no one
succeeded.
According to some sites I used ovs-dpctl add-flow, ovs-ofctl add-flow,
mod-flow, etc.
What is the correct way of doing this?
Tks.
--
Prof. Edison de Queiroz Albuquerque, BSc, Msc, Dr.
Adjunto da Escola Poli