I have a very urgent DIRECT CLIENT requirement for *Sr. SharePoint
Developer* in *Washington, DC*. Please Let Me Know If you have available
candidate, please reply with their word resume, location, rate and contact
number.

Please send the resumes at pe...@cncconsulting.com

Job Title: Sr. SharePoint Developer
Location: Washington, DC
Duration: 6 Months


*Need Green Card or US Citizens only*
Combination of onsite and remote work possible

Proposals are requested to develop the following:
Develop SharePoint sites (for 21 NEA offices)
Project documentation (for SharePoint sites)
The contractor shall provide analytical and research support for the
client's highly focused SharePoint Intranet environment. Primary
responsibilities involve the design and development of web/browser-based
content.

Duties/Responsibilities:
Conceptualize, develop and implement new internal web pages and act as a
team resource in solving specific web interaction issues pertaining to each
site;
Work closely with ITM to review concepts, wireframes, storyboards and
builds at project milestones for interaction design principles, overall
consistency and level of quality;
Provide hands-on support for Sharepoint sites to create functional examples
and act as a general resource for web development.

TASK 1: Develop SharePoint Sites
The contractor shall perform the following:
Develop sites for the 21 offices.
Populate each site with basic information for each office.
Upload documents/templates, contact info, guidelines/instructions, etc.
Discuss site content with individuals in the respective offices to tailor
site content as needed/appropriate.
During these discussions, the contractor may use the client's previous
intranet site as a basis of information to pull from when populating the
newly created SharePoint site.
During these discussions, individuals in each respective office may provide
the contractor with additional pieces of information with which to populate
that office's SharePoint site.
It is not anticipated that the contractor will have to create large amounts
of data from scratch or do a large amount of data gathering to pull data
together for the SharePoint sites.

TASK 2: SharePoint Project Documentation
The contractor shall perform the following:
The contractor shall provide written documentation showing the general
structure and lay-out of the SharePoint sites developed.
This should be written/conveyed in such a manner that, should the client
need to create additional sites after the end of this contract, the
documentation should assist the client in doing so.
The documentation should give the client the necessary information to
continue creating SharePoint sites in a consistent/standardized manner.
The contractor shall provide a 'walk-through'/presentation of the code to
the client's ITM office.
The project documentation / presentation of code may be provided in any
manner that adequately shows the structure and layout of the SharePoint
sites

Thanks

Peter Smith
Direct: 224-764-8535
Email ID: pe...@cncconsulting.com

-- 
You received this message because you are subscribed to the Google Groups "SAP 
BASIS" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to sap-basis+unsubscr...@googlegroups.com.
To post to this group, send email to sap-basis@googlegroups.com.
Visit this group at http://groups.google.com/group/sap-basis.
For more options, visit https://groups.google.com/d/optout.

Reply via email to