When 13-R came along fire spread up balconies, into each unit, through the bird
blocking and into the attic was a still fire scenario.
Operating one or two dozen heads became a real thing.
That said I don’t have an answer for your question.
Best.
> On Apr 8, 2020, at 16:39, Matt Grise via
This is my first time having this section of the IBC driving the sprinkler
requirements - I was hoping to get some insight on what the intent is.
We have a 4 story apartment building where we were hoping to exclude sprinklers
above the 4th floor balconies - the roof projection over them is
I have a warehouse with an area designated for assembling wall panels that
are then delivered to the job site.
There are no finished enclosures present which would make it a EH2.
Is OH2, wood product assembly, appropriate for this?
Thank you,
Bob Knight, CET III
Fire by Knight, LLC
I have a long grid and I can't get a calculation for the main bracing to
fall below the load value of the piping NFPA 13-9.3.5.5.2 (2016). If I have
longitudinal bracing installed on the branchlines, does it need to be
compliant along the entire run. Meaning 40'-0" from the end of line or main
and