Thanks Larry.
-Original Message-
From: Sprinklerforum [mailto:sprinklerforum-boun...@lists.firesprinkler.org] On
Behalf Of Larry Keeping
Sent: Friday, February 23, 2018 7:54 AM
To: sprinklerforum@lists.firesprinkler.org
Subject: RE: Lumberyard fire flows
[This message was identified
f Of Steve Leyton
Sent: February-23-18 10:38 AM
To: sprinklerforum@lists.firesprinkler.org
Subject: RE: Lumberyard fire flows
I'm sorry Larry, not following. Those section numbers not found in the Annex
of 2015 edition either.
SL
-Original Message-
From: Sprinklerforum [mailto:sprinkler
@lists.firesprinkler.org
Subject: RE: Lumberyard fire flows
[This message was identified as a phishing scam. Learn about phishing at
http://aka.ms/LearnAboutPhishing]
I was citing the NFPA 1 - 2015 edition.
Larry
-Original Message-
From: Sprinklerforum [mailto:sprinklerforum-boun
I was citing the NFPA 1 - 2015 edition.
Larry
-Original Message-
From: Sprinklerforum [mailto:sprinklerforum-boun...@lists.firesprinkler.org] On
Behalf Of Steve Leyton
Sent: February-22-18 5:47 PM
To: sprinklerforum@lists.firesprinkler.org
Subject: RE: Lumberyard fire flows
Which
Subject: RE: Lumberyard fire flows
[This message was identified as a phishing scam. Learn about phishing at
http://aka.ms/LearnAboutPhishing]
NFPA 1 in A.1.3.3.2.2 and A.3.4.3.1 provides some guidance regarding flow and
hydrant spacing for outside storage such as you are dealing with.
Best regards
Of Steve Leyton
Sent: February-22-18 1:54 PM
To: sprinklerforum@lists.firesprinkler.org
Subject: Lumberyard fire flows
This isn't a sprinkler question specifically, but FP-related: Has anyone ever
worked on design of a private fire main for a lumberyard? Huge outdoor piles
of stored wood products
In the end if you can’t confirm by a rational analysis that supports a
reasonable goal, (extinguish a fire of X size, if that fails protect important
on site exposures and all off site exposures) require ‘technical assistance ‘.
Best.
> On Feb 22, 2018, at 12:44, Bruce Verhei
Steve
You are required to calculate flows by an ‘approved method’.
If you haven’t previously put out for public comment and signed a scheme for
this I’d see what is already in use.
You might consider FMGlobal Data Sheet 7-10, 2-2.5.
Before I went very far with this I’d compare pile sizes,
:54 PM
To: sprinklerforum@lists.firesprinkler.org
Subject: Lumberyard fire flows [EXTERNAL]
This isn't a sprinkler question specifically, but FP-related: Has anyone ever
worked on design of a private fire main for a lumberyard? Huge outdoor piles
of stored wood products, engineered members mostly, some smalle
This isn't a sprinkler question specifically, but FP-related: Has anyone ever
worked on design of a private fire main for a lumberyard? Huge outdoor piles
of stored wood products, engineered members mostly, some smaller amounts of
dimensional lumber. We're trying to establish a fire