The test migration has now been completed and is available to view at:

http://svn.apache.org/repos/test/tomcat/build
http://svn.apache.org/repos/test/tomcat/container
http://svn.apache.org/repos/test/tomcat/jasper
http://svn.apache.org/repos/test/tomcat/connectors

I made the following changes from my original migration proposal:
- j-t-catalina -> /tomcat/container
- j-t-5        -> /tomcat/build
- added a /tomcat/connectors/tags/jk1.2.x directory

The first two changes were because using structure of my original proposal made it very difficult to migrate branches and tags for these modules. The third change just seemed like a good idea.

Also, when reviewing the test repository be aware that I made an error in my script (now fixed) and some of the 5.0.x tags are missing for the connector module. They will be present in the final migration.

Finally, it looks like we never tagged jasper and the connectors for 4.1.6. I do not plan to do anything about this. We can fix this later if we have to.

My intention is to give everyone 96 hours from now to review the repositories. Assuming no complaints and infrastructure availability, the migration will take place some time around 18.00 GMT Tuesday 27 September 2005.

Mark


---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to