Re: [trill] Alissa Cooper's Discuss on draft-ietf-trill-smart-endnodes-10: (withDISCUSS and COMMENT)

2018-03-13 Thread Donald Eastlake
Hi Alissa, A -11 version of draft-ietf-trill-smart-endnodes has been uploaded with the intent of resolving your discuss. Please look at it and see if you can clear. Thanks, Donald === Donald E. Eastlake 3rd +1-508-333-2270 (cell) 155 Beaver Street, Milford, MA

Re: [trill] Alissa Cooper's Discuss on draft-ietf-trill-smart-endnodes-10: (withDISCUSS and COMMENT)

2018-03-07 Thread Donald Eastlake
On Wed, Mar 7, 2018 at 10:01 AM, Alissa Cooper wrote: > Hi Fangwei, > > As I noted in response to the Gen-ART reviewer, I managed to ballot before > reading the rest of this thread (sorry!), but I still think the diagram in > 4.3 is confusing and not consistent with the text.

Re: [trill] Alissa Cooper's Discuss on draft-ietf-trill-smart-endnodes-10: (withDISCUSS and COMMENT)

2018-03-07 Thread Alissa Cooper
Hi Fangwei, As I noted in response to the Gen-ART reviewer, I managed to ballot before reading the rest of this thread (sorry!), but I still think the diagram in 4.3 is confusing and not consistent with the text. To my eye row 3 shows two bytes’ worth of fields but the label says “4 bytes.”

Re: [trill] Alissa Cooper's Discuss on draft-ietf-trill-smart-endnodes-10: (withDISCUSS and COMMENT)

2018-03-06 Thread hu.fangwei
Hi,Alissa Cooper Thanks for your review and comments. The new version(version 10) has updated to fix your comments. The format of Smart-MAC APP sub-TLV and the text has been changed to the following: The length of F,M,RSV,VLAN/FGL data Label is 4 bytes. and the length of VLAN/FGL