Hi guys,
Sorry I couldn't make the IRC - had to run off to a night class.
18:36:06ajborleywhat about MacOSX? there was a patch for that,
but I don't
know what the status is
18:36:17ajborleyI also don't have access to any mac machines
18:36:19robbinspgI'll do Mac OSX
18:36:32robbinspgso long
Following the IRC chat last night, I've put up the items we decided on and
who volunteered for them at
http://wiki.apache.org/ws/Tuscany/TuscanyCpp/Tasks. I have also raised
assigned Jiras - see the list that have been assigned to Fix-for Cpp-M2.
Cheers!
Andy
On 10/2/06, Jean-Sebastien Delfino
That would be good - we decided near the end of the IRC chat to have a
dependency on Axis2C 0.93 as we weren't sure exactly when 0.94
would be out
and we'd like our first RC by the end of this week. Saying that,
Sebastien
put in a tiny code change which made Tuscany work with the latest
On 10/4/06, Oisin Hurley [EMAIL PROTECTED] wrote:
Quick clarification Andy - will you be shifting axis version
before Milestone? Or saving it for after?
It depends when 0.94 comes out I guess - if it's soon then shifting is
probably a good idea (especially with some of the fixes that are
Quick clarification Andy - will you be shifting axis version
before Milestone? Or saving it for after?
It depends when 0.94 comes out I guess - if it's soon then
shifting is
probably a good idea (especially with some of the fixes that are
planned for
0.94), but I don't think we should
Andrew Borley wrote:
Hi Oisin,
On 10/4/06, Oisin Hurley [EMAIL PROTECTED] wrote:
Hi guys,
Sorry I couldn't make the IRC - had to run off to a night class.
18:36:06ajborleywhat about MacOSX? there was a patch for that,
but I don't
know what the status is
18:36:17ajborleyI also don't have
Hi All,
We will be having an IRC chat to discuss items for the C++ M2 release
today Tuesday, October 3rd, at 17:00 GMT, 18:00 BST, 10am PDT
The chat takes place on the freenode IRC network, (use server
irc.freenode.net), on channel #tuscany, and is scheduled to last one
hour. Please join us
Hi all,
We just had a good IRC chat about the forthcoming Tuscany C++ M2 release.
Main things decided:
- We will try to get Release Candidate 1 out by end of this week/early next
- Items in RC1 have been decided volunteered for, the list will be
available at http://wiki.apache.org/ws/Tuscany
Hi All,
I think it would be good if we could get our first release candidate
cut by or during ApacheCon (which is next week!) - do people think
that is possible?
With this in mind I propose we concentrate on the higher priority
stuff, which to my mind is documentation, samples, build
On 10/2/06, Andrew Borley [EMAIL PROTECTED] wrote:
Hi All,
I think it would be good if we could get our first release candidate
cut by or during ApacheCon (which is next week!) - do people think
that is possible?
With this in mind I propose we concentrate on the higher priority
stuff, which
Andy,
I'll do the change to the new licence text (hopefully tomorrow).
Should we have an IRC chat to prioritise outstanding items and Jiras? Is is
good to raise Jiras for all the work items such as doc etc so we can track
what get checked in from now up to the release. If we are trying to close
Pete Robbins wrote:
I think we should find a time tomorrow. I'm fairly flexible. 6pm BST (5pm
GMT, 10am Pacific) may fit best.
On 02/10/06, Andrew Borley [EMAIL PROTECTED] wrote:
Hi Pete,
Thanks for the licence text stuff. Yep, an IRC chat tracking items
via Jiras would be cool. When would
12 matches
Mail list logo