[ 
https://issues.apache.org/jira/browse/VCL-308?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andy Kurth updated VCL-308:
---------------------------

    Fix Version/s:     (was: 2.3)
                   2.4
    
> Computer load log does not account for images that have to be transferred to 
> another management node
> ----------------------------------------------------------------------------------------------------
>
>                 Key: VCL-308
>                 URL: https://issues.apache.org/jira/browse/VCL-308
>             Project: VCL
>          Issue Type: Bug
>          Components: vcld (backend)
>    Affects Versions: 2.0
>            Reporter: Andy Kurth
>             Fix For: 2.4
>
>
> The estimated time remaining displayed to the user does not include the time 
> it takes to retrieve image files from another managment node during image 
> load.  If the scheduling system thinks the image is preloaded but is not and 
> image retrieval is required, "Est: 1 min remaining" is displayed.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: 
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to