of the devil. Real Men will use frequency-based. Real Men with
purchasing authority will buy an external, industrial-strength,
general-purpose scheduler for their enterprise.
[...] IMHO, external, industrial strength, general purpose
scheduler[s] are
designed for general purpose use
: [Veritas-bu] Quarterly Backups and Calendar Schedule
of the devil. Real Men will use frequency-based. Real Men with
purchasing authority will buy an external, industrial-strength,
general-purpose scheduler for their enterprise.
[...] IMHO, external, industrial strength, general purpose
]
Curtis Preston [EMAIL PROTECTED]
Sent by: [EMAIL PROTECTED]
04/01/2008 10:35 PM
To
[EMAIL PROTECTED], veritas-bu@mailman.eng.auburn.edu
cc
Subject
Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
[...] Schedule-based backups (SBB) would give Randy more than
[...] uses
-6619
Pager 301-765-2703
[EMAIL PROTECTED]
Curtis Preston [EMAIL PROTECTED]
Sent by: [EMAIL PROTECTED]
04/01/2008 10:35 PM
To
[EMAIL PROTECTED], veritas-bu@mailman.eng.auburn.edu
cc
Subject
Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
[...] Schedule-based
[...] Schedule-based backups (SBB) would give Randy more than
[...] uses Frequency Based Backups (FBB), the first thing is he
Is there some reason to introduce a new, content-free term and acronym
here?
_All_ NetBackup-scheduled backups are schedule-based. They can be
frequency-based or
[...] Schedule-based backups (SBB) would give Randy more than
[...] uses Frequency Based Backups (FBB), the first thing is he
Is there some reason to introduce a new, content-free term and acronym
here?
Wow, I was brain-farting while typing late at night. I meant CBB, not
SBB. I just
Preston [mailto:[EMAIL PROTECTED]
Sent: Wednesday, 2 April 2008 1:22 PM
To: [EMAIL PROTECTED]; veritas-bu@mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
[...] Schedule-based backups (SBB) would give Randy more than
[...] uses Frequency Based Backups (FBB
] On Behalf Of Curtis
Preston
Sent: 31 March 2008 22:49
To: Ed Wilts; Wayne T Smith
Cc: VERITAS-BU@mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
Ed, I'm going to agree and disagree with you here.
The fact that we're saying that the jobs should run
on the last
On Mon, Mar 31, 2008 at 05:48:58PM -0400, Curtis Preston wrote:
A 7 year old backup is a 7 year old backup. It's not an archive, and
7 years from now when you're trying to use that 7 year old backup as
an archive and trying to retrieve something from it (you retrieve from
archives. You
On Mon, Mar 31, 2008 at 4:48 PM, Curtis Preston [EMAIL PROTECTED]
wrote:
Ed, I'm going to agree and disagree with you here.
Fair enough, so long as you'll let me point out an incorrect claim in your
argument too :-)
If he uses Frequency Based Backups (FBB), the first thing is he can't set
Actually, you're wrong here. NetBackup allows you to create a policy now
but not set it to go active until some point in the future. I've used
this and it works well.
I'm familiar with that and do it all the time, but I don't like it here.
First, what if I want to do this to an existing
I disagree (never good to disagree with Ed ... he's always right ...
here goes anyway)...
IMHO, Calendar schedules are superior to Frequency based schedules in
this case.
First, NetBackup can do last Friday of the month, but not quarter. If
you use NetBackup scheduling, you need to decide
On Sun, Mar 30, 2008 at 12:45 AM, Wayne T Smith [EMAIL PROTECTED] wrote:
I disagree (never good to disagree with Ed ... he's always right ...
here goes anyway)...
Now you've done it :-)
IMHO, Calendar schedules are superior to Frequency based schedules in
this case.
First, NetBackup can
Does anyone know of an easier way to configure a Quarterly backup
schedule to run on the last Friday of the Quarter other than going in
and manually selecting those 4 dates in the year for each policy? I can
do last Friday of the month but not last Friday of the Quarter. Just
wondering if there
PROTECTED]
03/28/2008 10:00 AM
To
VERITAS-BU@mailman.eng.auburn.edu
cc
Subject
[Veritas-bu] Quarterly Backups and Calendar Schedule
Does anyone know of an easier way to configure a Quarterly backup
schedule to run on the last Friday of the Quarter other
PROTECTED]
Sent by: [EMAIL PROTECTED]
03/28/2008 10:28 AM
To
[EMAIL PROTECTED]
cc
VERITAS-BU@mailman.eng.auburn.edu
Subject
Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
Well, it sounded good. You can?t use ?last Friday? (calendar based) with
Frequency. You can have Calendar based
Friday of the month
Or I am missing smthng ?
--
Misha Pavlov
This message uses only 100% recycled electrons.
Randy Samora [EMAIL PROTECTED]
Sent by: [EMAIL PROTECTED]
03/28/2008 10:00 AM
To
VERITAS-BU@mailman.eng.auburn.edu
cc
Subject
[Veritas-bu] Quarterly Backups and Calendar Schedule
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
I'd think that last Friday of the month with an 89 or so day frequency
would do it...if that can be configured, that is.
Ken Zufall
Technical Analyst
D660C
The Goodyear Tire Rubber Company
GTN 446.0592 or 330.796.0592
Randy
Message-
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Randy
Samora
Sent: Friday, March 28, 2008 10:00 AM
To: VERITAS-BU@mailman.eng.auburn.edu
Subject: [Veritas-bu] Quarterly Backups and Calendar Schedule
Does anyone know of an easier way to configure a Quarterly backup
schedule
;
[EMAIL PROTECTED]
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule [NC]
Define the easier way, please. Scripting ?
What's the stubmling block - figuring out last friday of the quarter ? -
wouldn't that be last Friday of the last month of the quarter, which is
actually known
Frankly, I would rethink your requirements - it's likely going to cause you
problems in the future. What are your recovery options if the backup
fails? If the backup only runs on the last Friday of the quarter, is it
okay to skip this quarter completely and reschedule the job for the next
: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Jeff
Lightner
Sent: Friday, March 28, 2008 10:44 AM
To: Randy Samora; [EMAIL PROTECTED]
Cc: VERITAS-BU@mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
Rather than relying on NetBackup's schedule you
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Jeff
Lightner
Sent: Friday, March 28, 2008 10:44 AM
To: Randy Samora; [EMAIL PROTECTED]
Cc: VERITAS-BU@mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule
Rather than
PROTECTED], 215 231 1556
-Original Message-
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED]
Sent: Friday, March 28, 2008 10:44 AM
To: Randy Samora
Cc: VERITAS-BU@mailman.eng.auburn.edu;
[EMAIL PROTECTED]
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule [NC]
Define
, March 28, 2008 10:44 AM
To: Randy Samora
Cc: VERITAS-BU@mailman.eng.auburn.edu;
[EMAIL PROTECTED]
Subject: Re: [Veritas-bu] Quarterly Backups and Calendar Schedule [NC]
Define the easier way, please. Scripting ?
What's the stubmling block - figuring out last friday of the quarter
25 matches
Mail list logo