Subject: Re: [Veritas-bu] 6.0 scheduler issues
An update on the support ticket...
After submitting logs and various other things requested by support, the
suggested solutions to my problem are:
1. Delete the pempersist file on a regular basis.
2. Disable checkpoints in the backup policy
Cc: veritas mailing list
Subject: Re: [Veritas-bu] 6.0 scheduler issues
An update on the support ticket...
After submitting logs and various other things requested by support, the
suggested solutions to my problem are:
1. Delete the pempersist file on a regular basis.
2. Disable checkpoints
An update on the support ticket...
After submitting logs and various other things requested by support, the
suggested solutions to my problem are:
1. Delete the pempersist file on a regular basis.
2. Disable checkpoints in the backup policy (this seems to be a major
contributor to the problem)
Sounds amazingly similar to what we ran into with MP3 - where bptm sent
a malformed or bad message to nbjm causing nbjm to crash, followed by
erratic behavior of pem and jm. I had to grab some Dr. Watson dumps for
confirmation and we're now running engineering binaries.
Jason
-Original
We had this one for the LONGEST while :(
/Steve
---
On Tue, 12 Sep 2006, Jerry wrote:
Not sure if any of you have been burned by this one,
but it surprised me today.
http://seer.entsupport.symantec.com/docs/281780.htm
I found out that random fulls had been skipped for
months on my new
On 9/12/2006 1:10 PM, Jon Bousselot wrote:
That tech doc doesn't describe my problem exactaly, but I'm having a bug
in 6.0mp3 where jobs don't run for weeks,
Log a call. There are so many bugs in the stock MP3 scheduler that
you'll need tech support to tell you if it's fixed in the