I did exactly what you are talking about. The VCS documentation assumes
you are doing an OS upgrade (upgrade the current Solaris 8 disk to 10),
but I did LiveUpgrade to a new disk. Because of that, I ended up doing
this:

- Bring up the node as Solaris 10 without VCS
- Manually installed the VCS 4.1 Solaris packages
- Applied the VCS maintenance pack to the same level as the other nodes
- From the Sol 8 disk, I copied over /etc/gabtab, /etc/llthosts and
/etc/llttab. Copy over any other custom agents or triggers if you have
them.
- Reboot; every node came up successfully after these steps

'Amen' to what Eric said below, my steps are complementary and expand
his step #2.

RCA
--
UNIX Administrator, BAE Systems EIT
desk 763-572-6684  mobile 612-419-9362

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Eric
Hennessey
Sent: Tuesday, February 12, 2008 7:20 AM
To: Glen Vassileff; veritas-ha@mailman.eng.auburn.edu
Subject: Re: [Veritas-ha] Solaris upgrade in a cluster - how
tominimizedowntime ?

This is perfectly do-able with VCS 4.1, since 4.1 supports Solaris 8, 9
and 10.

The general procedure at a high level is:

1.  Freeze all service groups
2.  Upgrade an idle node in the cluster
3.  Once the upgraded node reboots and rejoins the cluster, unfreeze the
service groups running on one of the servers and switch it/them to the
upgraded node
4.  Refreeze all service groups
5.  Upgrade the new idle node

Repeat as necessary until all servers are upgraded.

Eric

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Glen
Vassileff
Sent: Monday, February 11, 2008 7:29 PM
To: veritas-ha@mailman.eng.auburn.edu
Subject: [Veritas-ha] Solaris upgrade in a cluster - how to
minimizedowntime ?

I wonder what the right procedure to upgrade a cluster with minimal 
downtime.
Details: Solaris 8 to be upgraded to 10 with VCS 4.1.

The Admin guide suggests shutting the servers down ( I assume both 
nodes), we'd like to minimize the downtime and risks by upgrading nodes 
one at a time while running application on another node if possible (may

not be as Solaris versions will differ following the first upgrade).
Can we freeze resource groups on one node while upgrading the second 
node? Then, will we be able to failover to the upgraded node with nodes 
on different O/S levels (Solaris 8 -> Solaris 10)?

I realise that Solaris Live Upgrade may be our other option, though disk

space is an issue.

Regards

Glen
_______________________________________________
Veritas-ha maillist  -  Veritas-ha@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-ha

_______________________________________________
Veritas-ha maillist  -  Veritas-ha@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-ha

_______________________________________________
Veritas-ha maillist  -  Veritas-ha@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-ha

Reply via email to