#3117: When entities are performing a job and they are given a new job they do not go back to complete the incomplete job. ----------------------------------+-------------------- Reporter: monil.gupta@… | Type: bug Status: new | Priority: normal Milestone: unspecified | Component: other Version: 3.1_beta1 | Keywords: Blocked By: | Blocking: Operating System: Windows 7 | ----------------------------------+-------------------- The entities should return back to the old job and should complete the old job , when they are halted to do some task.
Test steps: 1. Start warzone2100. 2. Select the single player option. 3. Select the new campaign option. 4. Select a structure that can be assembled at a valid location from Build(F3). 5. Durind the construction of the structure order the unit to build another structure by selecting it from Build(f3). 6. Wait for the new construction to complete. 7. The entity should go back to the old construction for completion. Actual result: The entities do not go back to the task and complete them. -- Ticket URL: <http://developer.wz2100.net/ticket/3117> Warzone 2100 Trac <http://developer.wz2100.net/> The Warzone 2100 Project _______________________________________________ Warzone-dev mailing list Warzone-dev@gna.org https://mail.gna.org/listinfo/warzone-dev