Wilfred Spiegelenburg created YARN-6490:
-------------------------------------------

             Summary: Turn on assign multiple after removing continuous 
scheduling
                 Key: YARN-6490
                 URL: https://issues.apache.org/jira/browse/YARN-6490
             Project: Hadoop YARN
          Issue Type: Sub-task
            Reporter: Wilfred Spiegelenburg
            Assignee: Wilfred Spiegelenburg


To help loading up a cluster when not using continuous scheduling change the 
default for {{yarn.scheduler.fair.assignmultiple}} from {{false}} to {{true}}.

This requires the change from YARN-5035 to make sure that we leverage assigning 
more than one container to a node per heartbeat.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-dev-unsubscr...@hadoop.apache.org
For additional commands, e-mail: yarn-dev-h...@hadoop.apache.org

Reply via email to