[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-20 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15018859#comment-15018859
 ] 

Hadoop QA commented on YARN-3454:
-

| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue} 0m 7s 
{color} | {color:blue} docker + precommit patch detected. {color} |
| {color:green}+1{color} | {color:green} @author {color} | {color:green} 0m 0s 
{color} | {color:green} The patch does not contain any @author tags. {color} |
| {color:green}+1{color} | {color:green} test4tests {color} | {color:green} 0m 
0s {color} | {color:green} The patch appears to include 1 new or modified test 
files. {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 7m 
53s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 28s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 31s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} checkstyle {color} | {color:green} 0m 
13s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 37s 
{color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
16s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
29s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 28s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 30s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 0m 
39s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 36s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 36s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 37s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 37s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} checkstyle {color} | {color:green} 0m 
16s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 42s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
17s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} whitespace {color} | {color:green} 0m 
0s {color} | {color:green} Patch has no whitespace issues. {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
32s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 28s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 33s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 61m 54s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.8.0_66. {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 59m 57s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.7.0_85. {color} |
| {color:green}+1{color} | {color:green} asflicense {color} | {color:green} 0m 
28s {color} | {color:green} Patch does not generate ASF License warnings. 
{color} |
| {color:black}{color} | {color:black} {color} | {color:black} 141m 51s {color} 
| {color:black} {color} |
\\
\\
|| Reason || Tests ||
| JDK v1.8.0_66 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestAMAuthorization |
|   | hadoop.yarn.server.resourcemanager.TestClientRMTokens |
| JDK v1.7.0_85 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestAMAuthorization |
|   | hadoop.yarn.server.resourcemanager.scheduler.fifo.TestFifoScheduler |
|   | hadoop.yarn.server.resourcemanager.TestClientRMTokens |
\\
\\
|| Subsystem || Report/Notes ||
| Docker |  Image:yetus/hadoop:date2015-11-20 |
| JIRA Patch URL | 
https://issues.apache.org/jira/secure/attachment/12773572/YARN-3454.5.patch |
| JIRA Issue | YARN-3454 |
| Optional Tests | 

[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-19 Thread Carlo Curino (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15014118#comment-15014118
 ] 

Carlo Curino commented on YARN-3454:


updated patch fixes checkstyle/whitespace/javadoc... unit test failures seem 
not related... 

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.8.0, 2.7.1, 2.6.2
>Reporter: Carlo Curino
>Assignee: Carlo Curino
> Attachments: YARN-3454.1.patch, YARN-3454.2.patch, YARN-3454.3.patch, 
> YARN-3454.4.patch, YARN-3454.patch
>
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-19 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15014398#comment-15014398
 ] 

Hadoop QA commented on YARN-3454:
-

| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue} 0m 6s 
{color} | {color:blue} docker + precommit patch detected. {color} |
| {color:green}+1{color} | {color:green} @author {color} | {color:green} 0m 0s 
{color} | {color:green} The patch does not contain any @author tags. {color} |
| {color:green}+1{color} | {color:green} test4tests {color} | {color:green} 0m 
0s {color} | {color:green} The patch appears to include 1 new or modified test 
files. {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 9m 
11s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 44s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 39s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} checkstyle {color} | {color:green} 0m 
16s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 49s 
{color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
19s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
34s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 33s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 35s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 0m 
41s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 36s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 36s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 36s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 36s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} checkstyle {color} | {color:green} 0m 
16s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 46s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
17s {color} | {color:green} the patch passed {color} |
| {color:red}-1{color} | {color:red} whitespace {color} | {color:red} 0m 0s 
{color} | {color:red} The patch has 3 line(s) that end in whitespace. Use git 
apply --whitespace=fix. {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
40s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 32s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 32s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 62m 16s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.8.0_66. {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 62m 28s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.7.0_85. {color} |
| {color:green}+1{color} | {color:green} asflicense {color} | {color:green} 0m 
24s {color} | {color:green} Patch does not generate ASF License warnings. 
{color} |
| {color:black}{color} | {color:black} {color} | {color:black} 147m 0s {color} 
| {color:black} {color} |
\\
\\
|| Reason || Tests ||
| JDK v1.8.0_66 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestAMAuthorization |
|   | hadoop.yarn.server.resourcemanager.rmapp.TestRMAppTransitions |
|   | hadoop.yarn.server.resourcemanager.TestClientRMTokens |
| JDK v1.7.0_85 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestAMAuthorization |
|   | hadoop.yarn.server.resourcemanager.TestClientRMTokens |
\\
\\
|| Subsystem || Report/Notes ||
| Docker |  Image:yetus/hadoop:date2015-11-19 |
| JIRA Patch URL | 
https://issues.apache.org/jira/secure/attachment/12773303/YARN-3454.4.patch |
| JIRA 

[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-18 Thread Arun Suresh (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15012511#comment-15012511
 ] 

Arun Suresh commented on YARN-3454:
---

Thanks for the rev [~curino]. +1 pending jenkins

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.8.0, 2.7.1, 2.6.2
>Reporter: Carlo Curino
>Assignee: Carlo Curino
> Attachments: YARN-3454.1.patch, YARN-3454.2.patch, YARN-3454.3.patch, 
> YARN-3454.patch
>
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-18 Thread Carlo Curino (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15012498#comment-15012498
 ] 

Carlo Curino commented on YARN-3454:


V3 addresses a couple more details that [~asuresh] has kindly pointed out.

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.8.0, 2.7.1, 2.6.2
>Reporter: Carlo Curino
>Assignee: Carlo Curino
> Attachments: YARN-3454.1.patch, YARN-3454.2.patch, YARN-3454.3.patch, 
> YARN-3454.patch
>
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-18 Thread Carlo Curino (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15012364#comment-15012364
 ] 

Carlo Curino commented on YARN-3454:


[~asuresh] thanks for the prompt and thoughtful review. 

I agree with and have addressed all your comments. In particular, I am not 
using Resources.lessThan (which might trigger issues with the DRC as you 
suggested), but I am using Resources.fitsIn, which is implemented 
component-wise and independent from the ResourceCalculator ( and ideally will 
be evolved as Resource gets more dimensions).  I also added several more test 
cases for the subtractTestPositive to catch 
few of this corner cases.

Please let me know if this looks good. 

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.8.0, 2.7.1, 2.6.2
>Reporter: Carlo Curino
>Assignee: Carlo Curino
> Attachments: YARN-3454.1.patch, YARN-3454.patch
>
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-18 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15012822#comment-15012822
 ] 

Hadoop QA commented on YARN-3454:
-

| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue} 0m 8s 
{color} | {color:blue} docker + precommit patch detected. {color} |
| {color:green}+1{color} | {color:green} @author {color} | {color:green} 0m 0s 
{color} | {color:green} The patch does not contain any @author tags. {color} |
| {color:green}+1{color} | {color:green} test4tests {color} | {color:green} 0m 
0s {color} | {color:green} The patch appears to include 1 new or modified test 
files. {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 9m 
24s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 37s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 38s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} checkstyle {color} | {color:green} 0m 
16s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 45s 
{color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
19s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
35s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 32s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 37s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 0m 
47s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 42s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 42s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 45s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 45s 
{color} | {color:green} the patch passed {color} |
| {color:red}-1{color} | {color:red} checkstyle {color} | {color:red} 0m 18s 
{color} | {color:red} Patch generated 4 new checkstyle issues in 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager
 (total was 23, now 27). {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 51s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
20s {color} | {color:green} the patch passed {color} |
| {color:red}-1{color} | {color:red} whitespace {color} | {color:red} 0m 0s 
{color} | {color:red} The patch has 5 line(s) that end in whitespace. Use git 
apply --whitespace=fix. {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
50s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 35s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 40s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 72m 41s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.8.0_66. {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 71m 37s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.7.0_85. {color} |
| {color:green}+1{color} | {color:green} asflicense {color} | {color:green} 0m 
34s {color} | {color:green} Patch does not generate ASF License warnings. 
{color} |
| {color:black}{color} | {color:black} {color} | {color:black} 167m 58s {color} 
| {color:black} {color} |
\\
\\
|| Reason || Tests ||
| JDK v1.8.0_66 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestClientRMTokens |
|   | hadoop.yarn.server.resourcemanager.scheduler.fair.TestSchedulingPolicy |
|   | hadoop.yarn.server.resourcemanager.TestAMAuthorization |
|   | hadoop.yarn.server.resourcemanager.scheduler.fifo.TestFifoScheduler |
| JDK v1.7.0_85 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestClientRMTokens |
|   | 

[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-18 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15012709#comment-15012709
 ] 

Hadoop QA commented on YARN-3454:
-

| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue} 0m 8s 
{color} | {color:blue} docker + precommit patch detected. {color} |
| {color:green}+1{color} | {color:green} @author {color} | {color:green} 0m 0s 
{color} | {color:green} The patch does not contain any @author tags. {color} |
| {color:green}+1{color} | {color:green} test4tests {color} | {color:green} 0m 
0s {color} | {color:green} The patch appears to include 1 new or modified test 
files. {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 9m 
57s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 48s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 42s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} checkstyle {color} | {color:green} 0m 
16s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 51s 
{color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
19s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
36s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 33s 
{color} | {color:green} trunk passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 33s 
{color} | {color:green} trunk passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 0m 
43s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 42s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 42s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 39s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:green}+1{color} | {color:green} javac {color} | {color:green} 0m 39s 
{color} | {color:green} the patch passed {color} |
| {color:red}-1{color} | {color:red} checkstyle {color} | {color:red} 0m 18s 
{color} | {color:red} Patch generated 4 new checkstyle issues in 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager
 (total was 24, now 28). {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 47s 
{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
18s {color} | {color:green} the patch passed {color} |
| {color:red}-1{color} | {color:red} whitespace {color} | {color:red} 0m 0s 
{color} | {color:red} The patch has 5 line(s) that end in whitespace. Use git 
apply --whitespace=fix. {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
46s {color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 33s 
{color} | {color:green} the patch passed with JDK v1.8.0_66 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 35s 
{color} | {color:green} the patch passed with JDK v1.7.0_85 {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 65m 29s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.8.0_66. {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 65m 20s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.7.0_85. {color} |
| {color:green}+1{color} | {color:green} asflicense {color} | {color:green} 0m 
30s {color} | {color:green} Patch does not generate ASF License warnings. 
{color} |
| {color:black}{color} | {color:black} {color} | {color:black} 154m 39s {color} 
| {color:black} {color} |
\\
\\
|| Reason || Tests ||
| JDK v1.8.0_66 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestClientRMTokens |
|   | hadoop.yarn.server.resourcemanager.TestAMAuthorization |
| JDK v1.7.0_85 Failed junit tests | 
hadoop.yarn.server.resourcemanager.TestClientRMTokens |
|   | hadoop.yarn.server.resourcemanager.TestAMAuthorization |
|   | 
hadoop.yarn.server.resourcemanager.scheduler.capacity.TestApplicationPriority |
\\
\\
|| Subsystem || Report/Notes ||
| Docker 

[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-17 Thread Arun Suresh (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15009886#comment-15009886
 ] 

Arun Suresh commented on YARN-3454:
---

Other minor nits:
# You should probably use {{Resources.NONE}} instead of creating 
{{Resource.newInstance(0, 0)}}
# Do you really need to subclass PlanningException to flag neg. subtraction. I 
would prefer mentioning it in the error message, unless you want to 
specifically catch the exception somewhere and do something specific.

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.8.0, 2.7.1, 2.6.2
>Reporter: Carlo Curino
>Assignee: Carlo Curino
> Attachments: YARN-3454.1.patch, YARN-3454.patch
>
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-17 Thread Arun Suresh (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15009846#comment-15009846
 ] 

Arun Suresh commented on YARN-3454:
---

Thanks for the patch [~curino].

Took a pass at the patch. Couple of comments :
# RLESparseResourceAllocation::merge (line 348) : Might be better if the 
(operator == subtract || subtractTestPositive) check were outside the for loop 
before calling the negateIfNeeded. maybe pass a boolean into the function (to 
signal throwing an exception if the val < 0)
# If the object of the ‘subtractTestPositive’ is to ensure that each component 
of the resource be >= 0, then this might not hold true if you are using the 
DominantResourceCalculator (since it compares only the dominant resource.. and 
the subtracting the other resource can lead to a negative number)

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.8.0, 2.7.1, 2.6.2
>Reporter: Carlo Curino
>Assignee: Carlo Curino
> Attachments: YARN-3454.1.patch, YARN-3454.patch
>
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-16 Thread Carlo Curino (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15007518#comment-15007518
 ] 

Carlo Curino commented on YARN-3454:


The new "merge" functionalities we added has been used both to substitute the 
previously buggy logic that add/remove intervals, as well as to provide new 
functionalities. 
It is now easy to take two RLESparseResourceAllocation and subtract one from 
the other, or subtract and test the result is not negative (which we plan to 
use to improve the Plan/ReservationAgent interactions), as well as computing 
max/min etc.
 

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.6.0
>Reporter: Carlo Curino
>Assignee: Carlo Curino
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-16 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15007623#comment-15007623
 ] 

Hadoop QA commented on YARN-3454:
-

| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue} 0m 7s 
{color} | {color:blue} docker + precommit patch detected. {color} |
| {color:green}+1{color} | {color:green} @author {color} | {color:green} 0m 0s 
{color} | {color:green} The patch does not contain any @author tags. {color} |
| {color:green}+1{color} | {color:green} test4tests {color} | {color:green} 0m 
0s {color} | {color:green} The patch appears to include 1 new or modified test 
files. {color} |
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 3m 
19s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 26s 
{color} | {color:green} trunk passed with JDK v1.8.0_60 {color} |
| {color:green}+1{color} | {color:green} compile {color} | {color:green} 0m 27s 
{color} | {color:green} trunk passed with JDK v1.7.0_79 {color} |
| {color:green}+1{color} | {color:green} checkstyle {color} | {color:green} 0m 
13s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvnsite {color} | {color:green} 0m 34s 
{color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
17s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} findbugs {color} | {color:green} 1m 
17s {color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 26s 
{color} | {color:green} trunk passed with JDK v1.8.0_60 {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 29s 
{color} | {color:green} trunk passed with JDK v1.7.0_79 {color} |
| {color:red}-1{color} | {color:red} mvninstall {color} | {color:red} 0m 20s 
{color} | {color:red} hadoop-yarn-server-resourcemanager in the patch failed. 
{color} |
| {color:red}-1{color} | {color:red} compile {color} | {color:red} 0m 18s 
{color} | {color:red} hadoop-yarn-server-resourcemanager in the patch failed 
with JDK v1.8.0_60. {color} |
| {color:red}-1{color} | {color:red} javac {color} | {color:red} 0m 18s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.8.0_60. {color} |
| {color:red}-1{color} | {color:red} compile {color} | {color:red} 0m 20s 
{color} | {color:red} hadoop-yarn-server-resourcemanager in the patch failed 
with JDK v1.7.0_79. {color} |
| {color:red}-1{color} | {color:red} javac {color} | {color:red} 0m 20s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.7.0_79. {color} |
| {color:red}-1{color} | {color:red} checkstyle {color} | {color:red} 0m 15s 
{color} | {color:red} Patch generated 4 new checkstyle issues in 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager
 (total was 23, now 27). {color} |
| {color:red}-1{color} | {color:red} mvnsite {color} | {color:red} 0m 22s 
{color} | {color:red} hadoop-yarn-server-resourcemanager in the patch failed. 
{color} |
| {color:green}+1{color} | {color:green} mvneclipse {color} | {color:green} 0m 
16s {color} | {color:green} the patch passed {color} |
| {color:red}-1{color} | {color:red} whitespace {color} | {color:red} 0m 0s 
{color} | {color:red} The patch has 17 line(s) that end in whitespace. Use git 
apply --whitespace=fix. {color} |
| {color:red}-1{color} | {color:red} findbugs {color} | {color:red} 0m 21s 
{color} | {color:red} hadoop-yarn-server-resourcemanager in the patch failed. 
{color} |
| {color:red}-1{color} | {color:red} javadoc {color} | {color:red} 0m 25s 
{color} | {color:red} hadoop-yarn-server-resourcemanager in the patch failed 
with JDK v1.8.0_60. {color} |
| {color:red}-1{color} | {color:red} javadoc {color} | {color:red} 2m 0s 
{color} | {color:red} 
hadoop-yarn-project_hadoop-yarn_hadoop-yarn-server_hadoop-yarn-server-resourcemanager-jdk1.7.0_79
 with JDK v1.7.0_79 generated 4 new issues (was 2, now 6). {color} |
| {color:green}+1{color} | {color:green} javadoc {color} | {color:green} 0m 30s 
{color} | {color:green} the patch passed with JDK v1.7.0_79 {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 0m 18s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.8.0_60. {color} |
| {color:red}-1{color} | {color:red} unit {color} | {color:red} 0m 20s {color} 
| {color:red} hadoop-yarn-server-resourcemanager in the patch failed with JDK 
v1.7.0_79. {color} |
| {color:green}+1{color} | {color:green} asflicense {color} | {color:green} 0m 
24s {color} | {color:green} Patch does not generate ASF License warnings. 
{color} |
| {color:black}{color} | 

[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals (+ introducing support for efficient "merge" operations)

2015-11-16 Thread Carlo Curino (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=15007603#comment-15007603
 ] 

Carlo Curino commented on YARN-3454:


We also removed the minAlloc input parameter that was unused (and misleading, 
as it was easy to confuse it for the clusterResource needed for 
ResourceCalculator computations). 

> RLESparseResourceAllocation does not handle removal of partial intervals (+ 
> introducing support for efficient "merge" operations) 
> --
>
> Key: YARN-3454
> URL: https://issues.apache.org/jira/browse/YARN-3454
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: resourcemanager
>Affects Versions: 2.6.0
>Reporter: Carlo Curino
>Assignee: Carlo Curino
> Attachments: YARN-3454.patch
>
>
> The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
> match interval removals, but does not handles correctly partial overlaps. 
> In the context of this fix, we also introduced static methods to "merge" two 
> RLESparseResourceAllocation, while applying an operator in the process 
> (add/subtract/min/max/subtractTestPositive)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3454) RLESparseResourceAllocation does not handle removal of partial intervals

2015-04-06 Thread Carlo Curino (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14482370#comment-14482370
 ] 

Carlo Curino commented on YARN-3454:


Adding a capacity reservation (e.g., 10 containers) between time 10 and 20, and 
then removing the same containers from an interval between 12-18 does not work 
correctly. Only exact interval match work. This is normally not exercised in 
the Reservation sub-system, but for further enhancements we are working on this 
is needed. More generally this is a bug we should get rid off.  

 RLESparseResourceAllocation does not handle removal of partial intervals
 

 Key: YARN-3454
 URL: https://issues.apache.org/jira/browse/YARN-3454
 Project: Hadoop YARN
  Issue Type: Sub-task
  Components: resourcemanager
Affects Versions: 2.6.0
Reporter: Carlo Curino

 The RLESparseResourceAllocation.removeInterval(...) method handles well exact 
 match interval removals, but does not handles correctly partial overlaps. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)