[yocto] Yocto Project Status WW01`22

2022-01-04 Thread Stephen Jolley
Current Dev Position: YP 3.5 M2 Next Deadline: 17th Jan. 2022 YP 3.5 M2 build Next Team Meetings: * Bug Triage meeting Thursday Jan. 6th 7:30 am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] M+ & H bugs with Milestone Movements WW01

2022-01-03 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW01 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 5322 Global DNS fallback mechanism not present in poky distro

[yocto] Current high bug count owners for Yocto Project 3.5

2022-01-03 Thread Stephen Jolley
All, Below is the list as of top 44 bug owners as of the end of WW01 of who have open medium or higher bugs and enhancements against YP 3.5. There are 81 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Reminder: Yocto Project Technical Team Meeting @ Monthly from 8am on the first Tuesday (PDT)

2022-01-03 Thread Stephen Jolley
All, Just a reminder we will hold the monthly Yocto Project Technical Meeting at 8am PST tomorrow. (1/4) Yocto Project Technical Team Meeting: We encourage people attending the meeting to logon and announce themselves on the Yocto Project IRC chancel during the meeting (optional): Yocto

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-01-03 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] M+ & H bugs with Milestone Movements WW52

2021-12-27 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW52 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 5876 Add a test for the kernel -c menuconfig option

[yocto] Enhancements/Bugs closed WW52!

2021-12-27 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 3 richard.pur...@linuxfoundation.org 3 trevor.gamb...@windriver.com 2 Grand Total 8 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 3.5

2021-12-27 Thread Stephen Jolley
All, Below is the list as of top 45 bug owners as of the end of WW52 of who have open medium or higher bugs and enhancements against YP 3.5. There are 85 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-12-27 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW51`21

2021-12-21 Thread Stephen Jolley
Current Dev Position: YP 3.5 M2 Next Deadline: 17th Jan. 2022 YP 3.5 M2 build Next Team Meetings: * Bug Triage meeting Thursday Dec. 23rd 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] M+ & H bugs with Milestone Movements WW51

2021-12-20 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW51 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 12368 persistent bitbake server does not re-parse if previous build was

[yocto] Enhancements/Bugs closed WW51!

2021-12-20 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 5 st...@sakoman.com 1 akuster...@gmail.com 1 Grand Total 7 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208)

[yocto] Current high bug count owners for Yocto Project 3.5

2021-12-20 Thread Stephen Jolley
All, Below is the list as of top 44 bug owners as of the end of WW51 of who have open medium or higher bugs and enhancements against YP 3.5. There are 89 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-12-20 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW50`21

2021-12-14 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Dec. 16th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)

[yocto] M+ & H bugs with Milestone Movements WW50

2021-12-13 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW50 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 10693 Add a testcase for multilib eSDK on the autobuilder

[yocto] Enhancements/Bugs closed WW50!

2021-12-13 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 4 jon.ma...@arm.com 1 randy.macl...@windriver.com 1 Grand Total 6 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 3.5

2021-12-13 Thread Stephen Jolley
All, Below is the list as of top 46 bug owners as of the end of WW50 of who have open medium or higher bugs and enhancements against YP 3.5. There are 94 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-12-13 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW49`21

2021-12-07 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Dec. 9th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] Enhancements/Bugs closed WW49!

2021-12-06 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count michael.opdenac...@bootlin.com 1 Grand Total 1 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208) 244-4460 * Email:

[yocto] Current high bug count owners for Yocto Project 3.5

2021-12-06 Thread Stephen Jolley
All, Below is the list as of top 46 bug owners as of the end of WW49 of who have open medium or higher bugs and enhancements against YP 3.5. There are 99 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 36

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-12-06 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW48`21

2021-11-30 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Dec. 9th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] M+ & H bugs with Milestone Movements WW48

2021-11-29 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW48 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 13183 bitbake-layers crashes with incorrect layer configuration data is given

[yocto] Enhancements/Bugs closed WW48!

2021-11-29 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 2 trevor.gamb...@windriver.com 1 anuj.mit...@intel.com 1 randy.macl...@windriver.com 1 ern...@gmail.com 1 Grand Total 6 Thanks, Stephen K.

[yocto] Current high bug count owners for Yocto Project 3.5

2021-11-29 Thread Stephen Jolley
All, Below is the list as of top 46 bug owners as of the end of WW48 of who have open medium or higher bugs and enhancements against YP 3.5. There are 104 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 36

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-11-29 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW46`21

2021-11-23 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Nov. 25th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)

[yocto] Enhancements/Bugs closed WW47!

2021-11-22 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 4 randy.macl...@windriver.com 2 r...@burtonini.com 1 st...@sakoman.com 1 akuster...@gmail.com 1 Grand Total 9 Thanks, Stephen K. Jolley Yocto

[yocto] Current high bug count owners for Yocto Project 3.5

2021-11-22 Thread Stephen Jolley
All, Below is the list as of top 47 bug owners as of the end of WW47 of who have open medium or higher bugs and enhancements against YP 3.5. There are 108 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 36

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-11-22 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW46`21

2021-11-16 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Nov.18th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] M+ & H bugs with Milestone Movements WW46

2021-11-15 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW46 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 13722 Debugging With the GNU Project Debugger enhancements

[yocto] Enhancements/Bugs closed WW46!

2021-11-15 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 11 r...@burtonini.com 2 randy.macl...@windriver.com 1 trevor.gamb...@windriver.com 1 akuster...@gmail.com 1 kai.k...@windriver.com 1

[yocto] Current high bug count owners for Yocto Project 3.5

2021-11-15 Thread Stephen Jolley
All, Below is the list as of top 46 bug owners as of the end of WW46 of who have open medium or higher bugs and enhancements against YP 3.5. There are 113 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count michael.opdenac...@bootlin.com

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-11-15 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW45`21

2021-11-09 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Nov.11th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] M+ & H bugs with Milestone Movements WW45

2021-11-08 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW45 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 12917 Warnings from nightly-multilib builds (build-deps)

[yocto] Enhancements/Bugs closed WW45!

2021-11-08 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 5 randy.macl...@windriver.com 3 caner.altinba...@gmail.com 1 diego.sue...@arm.com 1 akuster...@gmail.com 1 trevor.gamb...@windriver.com 1 Grand

[yocto] Current high bug count owners for Yocto Project 3.5

2021-11-08 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW45 of who have open medium or higher bugs and enhancements against YP 3.5. There are 118 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-11-08 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW43`21

2021-11-02 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Nov. 4th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] M+ & H bugs with Milestone Movements WW44

2021-11-01 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW44 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 12917 Warnings from nightly-multilib builds (build-deps)

[yocto] Enhancements/Bugs closed WW44!

2021-11-01 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 1 mickael.laventure+yo...@gmail.com 1 st...@sakoman.com 1 Grand Total 3 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 3.5

2021-11-01 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW44 of who have open medium or higher bugs and enhancements against YP 3.5. There are 123 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 37

[yocto] Reminder: Yocto Project Technical Team Meeting @ Monthly from 8am on the first Tuesday (PDT)

2021-11-01 Thread Stephen Jolley
All, Just a reminder we will hold the monthly Yocto Project Technical Meeting at 8am PST tomorrow. (11/2) Yocto Project Technical Team Meeting: We encourage people attending the meeting to logon and announce themselves on the Yocto Project IRC chancel during the meeting (optional):

[yocto] Yocto Project Status WW43`21

2021-10-26 Thread Stephen Jolley
Current Dev Position: YP 3.5 M1 Next Deadline: 6th Dec. 2021 YP 3.5 M1 build Next Team Meetings: * Bug Triage meeting Thursday Oct. 28th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)

[yocto] Enhancements/Bugs closed WW43!

2021-10-25 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 3 michael.opdenac...@bootlin.com 3 randy.macl...@windriver.com 2 douglas.ro...@taitradio.com 1 devendra.tew...@gmail.com 1

[yocto] Current high bug count owners for Yocto Project 3.5

2021-10-25 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW43 of who have open medium or higher bugs and enhancements against YP 3.5. There are 128 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-10-25 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW42!

2021-10-18 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 5 randy.macl...@windriver.com 3 alex.kana...@gmail.com 2 thomas.per...@bootlin.com 1 david.re...@windriver.com 1 rgauth...@dimonoff.com 1

[yocto] Current high bug count owners for Yocto Project 3.5

2021-10-18 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW42 of who have open medium or higher bugs and enhancements against YP 3.5. There are 42 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count michael.opdenac...@bootlin.com 40

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-10-18 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW41`21

2021-10-12 Thread Stephen Jolley
Current Dev Position: YP 3.4 M4 Next Deadline: 29th Oct. 2021 YP 3.4 M4 release Next Team Meetings: * Bug Triage meeting Thursday Oct. 14th at 7:30am PDT (

[yocto] Enhancements/Bugs closed WW40!

2021-10-11 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 2 mhalst...@linuxfoundation.org 1 r...@burtonini.com 1 Grand Total 4 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 3.4

2021-10-11 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW41 of who have open medium or higher bugs and enhancements against YP 3.4. There are 13 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 34

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-10-11 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW40`21

2021-10-05 Thread Stephen Jolley
Current Dev Position: YP 3.4 M4 Next Deadline: 4th Oct. 2021 YP 3.4 M4 build Next Team Meetings: * Bug Triage meeting Thursday Oct. 7th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] M+ & H bugs with Milestone Movements WW40

2021-10-04 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW40 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 14263 AB-INT PTEST: lttng-tools ptest intermittent failure

[yocto] Enhancements/Bugs closed WW40!

2021-10-04 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 7 oobit...@cisco.com 1 alexandre.bell...@bootlin.com 1 Grand Total 9 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 3.4

2021-10-04 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW40 of who have open medium or higher bugs and enhancements against YP 3.4. There are 18 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 35

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-10-04 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Reminder: Yocto Project Technical Team Meeting @ Monthly from 8am on the first Tuesday (PDT)

2021-10-04 Thread Stephen Jolley
All, Just a reminder we will hold the monthly Yocto Project Technical Meeting at 8am PST tomorrow. (10/5) Yocto Project Technical Team Meeting: We encourage people attending the meeting to logon and announce themselves on the Yocto Project IRC chancel during the meeting (optional):

[yocto] Yocto Project Status WW39`21

2021-09-28 Thread Stephen Jolley
Current Dev Position: YP 3.4 M4 Next Deadline: 4th Oct. 2021 YP 3.4 M4 build Next Team Meetings: * Bug Triage meeting Thursday Sept. 30th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)

[yocto] M+ & H bugs with Milestone Movements WW39

2021-09-27 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW39 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 12937 Consistent naming scheme for deployed artifacts

[yocto] Enhancements/Bugs closed WW39!

2021-09-27 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 12 mhalst...@linuxfoundation.org 1 saul.w...@windriver.com 1 jon.ma...@arm.com 1 michael.opdenac...@bootlin.com 1 st...@sakoman.com 1 Grand Total

[yocto] Current high bug count owners for Yocto Project 3.4

2021-09-27 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW39 of who have open medium or higher bugs and enhancements against YP 3.4. There are 23 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 35

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-09-27 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW38`21

2021-09-21 Thread Stephen Jolley
Current Dev Position: YP 3.4 M4 Next Deadline: 4th Oct. 2021 YP 3.4 M4 build Next Team Meetings: * Bug Triage meeting Thursday Sept. 23rd at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)

[yocto] M+ & H bugs with Milestone Movements WW38

2021-09-20 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW38 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 13533 Devtool finish on _git package with SRCPV in PV points to wrong WORKDIR

[yocto] Enhancements/Bugs closed WW38!

2021-09-20 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 4 michael.opdenac...@bootlin.com 1 alexandre.bell...@bootlin.com 1 yi.z...@windriver.com 1 to...@cybernetics.com 1 qi.c...@windriver.com 1

[yocto] Current high bug count owners for Yocto Project 3.4

2021-09-20 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW38 of who have open medium or higher bugs and enhancements against YP 3.4. There are 28 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-09-20 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW37`21

2021-09-14 Thread Stephen Jolley
Current Dev Position: YP 3.4 M4 Next Deadline: 4th Oct. 2021 YP 3.4 M4 build Next Team Meetings: * Bug Triage meeting Thursday Sept. 16th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)

[yocto] M+ & H bugs with Milestone Movements WW37

2021-09-13 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW37 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 5322 Global DNS fallback mechanism not present in poky distro

[yocto] Enhancements/Bugs closed WW36!

2021-09-13 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 8 mhalst...@linuxfoundation.org 2 weave...@gmail.com 1 randy.macl...@windriver.com 1 st...@sakoman.com 1 Grand Total 13 Thanks, Stephen K.

[yocto] Current high bug count owners for Yocto Project 3.4

2021-09-13 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW37 of who have open medium or higher bugs and enhancements against YP 3.4. There are 33 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-09-13 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

Re: [yocto] Minutes: Yocto Project Weekly Triage Meeting 9/9/2021

2021-09-09 Thread Stephen Jolley
Done with AR Stephen From: Trevor Gamblin Sent: Thursday, September 9, 2021 8:06 AM To: Yocto-mailing-list Cc: Richard Purdie ; trevor.gamb...@windriver.com; MacLeod, Randy ; st...@sakoman.com; timothy.t.orl...@intel.com; sjolley.yp...@gmail.com; alexandre.bell...@bootlin.com; Ross

[yocto] Yocto Project Status WW36`21

2021-09-07 Thread Stephen Jolley
Current Dev Position: YP 3.4 M4 Next Deadline: 4th Oct. 2021 YP 3.4 M4 build Next Team Meetings: * Bug Triage meeting Thursday Sept. 9th at 7:30am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)

[yocto] M+ & H bugs with Milestone Movements WW36

2021-09-06 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW36 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 14534 Online search feature really needs usability improvments.

[yocto] Enhancements/Bugs closed WW36!

2021-09-06 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 2 alexandre.bell...@bootlin.com 1 michael.opdenac...@bootlin.com 1 richard.pur...@linuxfoundation.org 1 Grand Total 5 Thanks, Stephen K. Jolley Yocto

[yocto] Current high bug count owners for Yocto Project 3.4

2021-09-06 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW36 of who have open medium or higher bugs and enhancements against YP 3.4. There are 37 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 36

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-09-06 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Reminder: Yocto Project Technical Team Meeting @ Monthly from 8am on the first Tuesday (PDT)

2021-09-06 Thread Stephen Jolley
All, Just a reminder we will hold the monthly Yocto Project Technical Meeting at 8am PST tomorrow. (9/7) Yocto Project Technical Team Meeting: We encourage people attending the meeting to logon and announce themselves on the Yocto Project IRC chancel during the meeting (optional): Yocto

[yocto] Yocto Project Status WW35`21

2021-08-31 Thread Stephen Jolley
Current Dev Position: YP 3.4 M3 (Feature Freeze) Next Deadline: 23rd Aug. 2021 YP 3.4 M3 build (Feature Freeze) Next Team Meetings: * Bug Triage meeting Thursday Sept. 2nd at 7:30am PDT (

[yocto] M+ & H bugs with Milestone Movements WW35

2021-08-30 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW35 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 13025 WIC image install support kexin@windriver.com

[yocto] Current high bug count owners for Yocto Project 3.4

2021-08-30 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW35 of who have open medium or higher bugs and enhancements against YP 3.4. There are 42 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 32

[yocto] Yocto Project Status WW34`21

2021-08-24 Thread Stephen Jolley
Current Dev Position: YP 3.4 M3 (Feature Freeze) Next Deadline: 23rd Aug. 2021 YP 3.4 M3 build (Feature Freeze) Next Team Meetings: * Bug Triage meeting Thursday Aug. 26th at 7:30am PDT (

[yocto] M+ & H bugs with Milestone Movements WW34

2021-08-23 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW34 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 13722 Debugging With the GNU Project Debugger enhancements

[yocto] Enhancements/Bugs closed WW34!

2021-08-23 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count r...@burtonini.com 2 fransmeulenbro...@yahoo.com 1 alexandre.bell...@bootlin.com 1 randy.macl...@windriver.com 1 jay.shen.t...@intel.com 1 Grand Total 6 Thanks, Stephen K.

[yocto] Current high bug count owners for Yocto Project 3.4

2021-08-23 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW34 of who have open medium or higher bugs and enhancements against YP 3.4. There are 47 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count michael.opdenac...@bootlin.com 32

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-08-23 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW33`21

2021-08-17 Thread Stephen Jolley
Current Dev Position: YP 3.4 M3 Next Deadline: 23rd Aug. 2021 YP 3.4 M3 build (Feature Freeze) Next Team Meetings: * Bug Triage meeting Thursday Aug. 19th at 7:30am PDT (

[yocto] M+ & H bugs with Milestone Movements WW33

2021-08-16 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW33 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 13975 cve-checker: save to alternate file format like JSON

[yocto] Enhancements/Bugs closed WW33!

2021-08-16 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 2 mhalst...@linuxfoundation.org 2 r...@burtonini.com 2 Grand Total 6 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 3.4

2021-08-16 Thread Stephen Jolley
All, Below is the list as of top 50 bug owners as of the end of WW33 of who have open medium or higher bugs and enhancements against YP 3.4. There are 52 possible work days left until the final release candidates for YP 3.4 needs to be released. Who Count r...@burtonini.com 32

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2021-08-16 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status WW32`21

2021-08-10 Thread Stephen Jolley
Current Dev Position: YP 3.4 M3 Next Deadline: 23rd Aug. 2021 YP 3.4 M3 build (Feature Freeze) Next Team Meetings: * Bug Triage meeting Thursday Aug. 12th at 7:30am PDT (