[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-06-07 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-06-07 Thread Stephen Jolley
All, Below is the list as of top 38 bug owners as of the end of WW23 of who have open medium or higher bugs and enhancements against YP 4.1. There are 101 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com

[yocto] Current high bug count owners for Yocto Project 4.1

2022-06-14 Thread Stephen Jolley
All, Below is the list as of top 41 bug owners as of the end of WW24 of who have open medium or higher bugs and enhancements against YP 4.1. There are 96 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-06-14 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] M+ & H bugs with Milestone Movements WW24

2022-06-14 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW24 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 11704 Add other resource monitoring options to conf/local.conf

[yocto] Yocto Project Status WW42`22

2022-06-14 Thread Stephen Jolley
Current Dev Position: YP 4.1 M2 Next Deadline: 11th July 2022 YP 4.1 M2 Build Next Team Meetings: * Bug Triage meeting Thursday June 16th 7:30 am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] Current high bug count owners for Yocto Project 4.1

2022-06-20 Thread Stephen Jolley
All, Below is the list as of top 39 bug owners as of the end of WW25 of who have open medium or higher bugs and enhancements against YP 4.1. There are 91 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-06-20 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] M+ & H bugs with Milestone Movements WW25

2022-06-20 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW25 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 5322 Global DNS fallback mechanism not present in poky distro

[yocto] Yocto Project Status WW21`22

2022-05-24 Thread Stephen Jolley
Current Dev Position: YP 4.1 M1 Next Deadline: 30th May 2022 YP 4.1 M1 Build Next Team Meetings: * Bug Triage meeting Thursday May 26th 7:30 am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-05-24 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-05-24 Thread Stephen Jolley
All, Below is the list as of top 36 bug owners as of the end of WW21 of who have open medium or higher bugs and enhancements against YP 4.1. There are 110 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com

[yocto] Enhancements/Bugs closed WW21

2022-05-24 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count michael.opdenac...@bootlin.com 2 mhalst...@linuxfoundation.org 1 Grand Total 3 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208) 244-4460 *

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-07-18 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-07-18 Thread Stephen Jolley
All, Below is the list as of top 37 bug owners as of the end of WW29 of who have open medium or higher bugs and enhancements against YP 4.1. There are 72 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 36

[yocto] Enhancements/Bugs closed WW29!

2022-07-18 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 4 ross.bur...@arm.com 1 Grand Total 5 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208) 244-4460 * Email:

[yocto] Yocto Project Status 28 June 2022 (WW26)

2022-06-28 Thread Stephen Jolley
Current Dev Position: YP 4.1 M2 Next Deadline: 11th July 2022 YP 4.1 M2 Build Next Team Meetings: * Bug Triage meeting Thursday June 30th 7:30 am PDT ( https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) *

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-04-18 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 3.5

2022-04-18 Thread Stephen Jolley
All, Below is the list as of top 30 bug owners as of the end of WW16 of who have open medium or higher bugs and enhancements against YP 3.5. There are 8 possible work days left until the final release candidates for YP 3.5 needs to be released. Who Count r...@burtonini.com 21

[yocto] Enhancements/Bugs closed WW16

2022-04-18 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 15 randy.macl...@windriver.com 8 alexandre.bell...@bootlin.com 2 tim.orl...@konsulko.com 1 gregorylu...@microsoft.com 1

[yocto] M+ & H bugs with Milestone Movements WW16

2022-04-18 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW16 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 12279 enhance manifest not found warning randy.macl...@windriver.com

[yocto] Enhancements/Bugs closed WW18

2022-05-03 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 6 ross.bur...@arm.com 2 akuster...@gmail.com 2 mhalst...@linuxfoundation.org 1 Grand Total 11 Thanks, Stephen K. Jolley Yocto Project Program Manager

[yocto] M+ & H bugs with Milestone Movements WW18

2022-05-03 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW18 are listed below: Priority Bug ID Short Description Changer Owner Was Became High 14065 Automated ptest regression testing randy.macl...@windriver.com

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-05-03 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-05-03 Thread Stephen Jolley
All, Below is the list as of top 39 bug owners as of the end of WW18 of who have open medium or higher bugs and enhancements against YP 4.1. There are 125 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-05-09 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-05-09 Thread Stephen Jolley
All, Below is the list as of top 40 bug owners as of the end of WW19 of who have open medium or higher bugs and enhancements against YP 4.1. There are 120 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com

[yocto] Enhancements/Bugs closed WW19

2022-05-09 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 3 sundeep.kokko...@gmail.com 1 akuster...@gmail.com 1 Grand Total 5 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-08-01 Thread Stephen Jolley
All, Below is the list as of top 37 bug owners as of the end of WW31 of who have open medium or higher bugs and enhancements against YP 4.1. There are 62 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-08-01 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] M+ & H bugs with Milestone Movements WW31

2022-08-01 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW31 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 14800 AB-INT PTEST: libgcrypt ptest intermittent failure

[yocto] Enhancements/Bugs closed WW31!

2022-08-01 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count ross.bur...@arm.com 1 mhalst...@linuxfoundation.org 1 Grand Total 2 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208) 244-4460 * Email:

[yocto] Yocto Project Status 23 August 2022 (WW34)

2022-08-23 Thread Stephen Jolley
Current Dev Position: YP 4.1 M3 (Feature Freeze) Next Deadline: 22nd August 2022 YP 4.1 M3 Build Next Team Meetings: * Bug Triage meeting Thursday August 25th 7:30 am PDT (

[yocto] M+ & H bugs with Milestone Movements WW35

2022-08-29 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW35 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 13123 package.PackageTests.test_gdb_hardlink_debug failed

[yocto] Current high bug count owners for Yocto Project 4.1

2022-08-29 Thread Stephen Jolley
All, Below is the list as of top 35 bug owners as of the end of WW35 of who have open medium or higher bugs and enhancements against YP 4.1. There are 42 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-08-29 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW35!

2022-08-29 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count pa...@zhukoff.net 4 skulka...@mvista.com 1 ross.bur...@arm.com 1 ern...@gmail.com 1 randy.macl...@windriver.com 1 Grand Total 8 Thanks, Stephen K. Jolley Yocto Project Program

[yocto] M+ & H bugs with Milestone Movements WW36

2022-09-05 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW36 are listed below: Priority Bug ID Short Description Changer Owner Was Became High 14065 Automated ptest regression testing randy.macl...@windriver.com

[yocto] Enhancements/Bugs closed WW36!

2022-09-05 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 4 jpewhac...@gmail.com 2 mhalst...@linuxfoundation.org 1 Grand Total 7 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-09-05 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-09-05 Thread Stephen Jolley
All, Below is the list as of top 35 bug owners as of the end of WW36 of who have open medium or higher bugs and enhancements against YP 4.1. There are 37 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] Yocto Project Status 6 September 2022 (WW36)

2022-09-06 Thread Stephen Jolley
Current Dev Position: YP 4.1 M3 (Feature Freeze) Next Deadline: 22nd August 2022 YP 4.1 M3 Build Next Team Meetings: * Bug Triage meeting Thursday September 8th 7:30 am PDT (

[yocto] Yocto Project Status 30 August 2022 (WW35)

2022-08-30 Thread Stephen Jolley
Current Dev Position: YP 4.1 M3 (Feature Freeze) Next Deadline: 22nd August 2022 YP 4.1 M3 Build Next Team Meetings: * Bug Triage meeting Thursday September 1st 7:30 am PDT (

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-08-22 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-08-22 Thread Stephen Jolley
All, Below is the list as of top 36 bug owners as of the end of WW34 of who have open medium or higher bugs and enhancements against YP 4.1. There are 47 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 36

[yocto] M+ & H bugs with Milestone Movements WW34

2022-08-22 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW34 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 14125 busybox wget ssl is exposed to MitM attack due to CVE-2018-1000500

[yocto] Enhancements/Bugs closed WW34!

2022-08-22 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 5 johannes.schri...@blueye.no 1 richard.pur...@linuxfoundation.org 1 Grand Total 7 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] M+ & H bugs with Milestone Movements WW39

2022-09-26 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW39 are listed below: Priority Bug ID Short Description Changer Owner Was Became High 14065 Automated ptest regression testing richard.pur...@linuxfoundation.org

[yocto] Enhancements/Bugs closed WW39!

2022-09-26 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count yashinde...@gmail.com 1 ross.bur...@arm.com 1 alejan...@enedino.org 1 alexandre.bell...@bootlin.com 1 Grand Total 4 Thanks, Stephen K. Jolley Yocto Project Program Manager *

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-09-26 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-09-26 Thread Stephen Jolley
All, Below is the list as of top 35 bug owners as of the end of WW39 of who have open medium or higher bugs and enhancements against YP 4.1. There are 23 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 33

[yocto] Yocto Project Status 27 September 2022 (WW39)

2022-09-27 Thread Stephen Jolley
Current Dev Position: YP 4.1 M4 (Feature Freeze) Next Deadline: 3rd October 2022 YP 4.1 M4 Build Next Team Meetings: * Bug Triage meeting Thursday September 29th 7:30 am PDT (

[yocto] Enhancements/Bugs closed WW42!

2022-10-17 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count ross.bur...@arm.com 3 randy.macl...@windriver.com 3 Grand Total 6 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208) 244-4460 * Email:

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-10-17 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-10-24 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW43!

2022-10-24 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count mark.asselst...@windriver.com 2 randy.macl...@windriver.com 1 Grand Total 3 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208) 244-4460 * Email:

[yocto] M+ & H bugs with Milestone Movements WW43

2022-10-24 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW43 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 14311 AB-INT PTEST: valgrind drd/tests ptest intermittent failure

[yocto] Current high bug count owners for Yocto Project 4.2

2022-10-24 Thread Stephen Jolley
All, Below is the list as of top 34 bug owners as of the end of WW43 of who have open medium or higher bugs and enhancements against YP 4.2. There are 128 possible work days left until the final release candidates for YP 4.2 needs to be released. Who Count michael.opdenac...@bootlin.com

[yocto] Yocto Project Status 25 October 2022 (WW43)

2022-10-25 Thread Stephen Jolley
Current Dev Position: YP 4.2 M1 Next Deadline: 5th December 2022 YP 4.2 Build Next Team Meetings: * Bug Triage meeting Thursday October 27th 7:30 am PDT (

[yocto] Current high bug count owners for Yocto Project 4.1

2022-09-19 Thread Stephen Jolley
All, Below is the list as of top 35 bug owners as of the end of WW38 of who have open medium or higher bugs and enhancements against YP 4.1. There are 28 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] M+ & H bugs with Milestone Movements WW38

2022-09-19 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW38 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 6428 Improve the ability to isolate changes that have caused a rebuild

[yocto] Enhancements/Bugs closed WW38!

2022-09-19 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 1 sundeep.kokko...@gmail.com 1 jon.ma...@arm.com 1 Grand Total 3 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208)

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-09-19 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW36!

2022-09-12 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 4 randy.macl...@windriver.com 3 pa...@zhukoff.net 1 mhalst...@linuxfoundation.org 1 Grand Total 9 Thanks, Stephen K. Jolley Yocto Project

[yocto] Current high bug count owners for Yocto Project 4.1

2022-09-12 Thread Stephen Jolley
All, Below is the list as of top 35 bug owners as of the end of WW37 of who have open medium or higher bugs and enhancements against YP 4.1. There are 33 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 37

[yocto] M+ & H bugs with Milestone Movements WW37

2022-09-12 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW37 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 12279 enhance manifest not found warning randy.macl...@windriver.com

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-09-12 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Yocto Project Status 20 September 2022 (WW38)

2022-09-20 Thread Stephen Jolley
Current Dev Position: YP 4.1 M4 (Feature Freeze) Next Deadline: 3rd October 2022 YP 4.1 M4 Build Next Team Meetings: * Bug Triage meeting Thursday September 22nd 7:30 am PDT (

[yocto] Yocto Project Status 13 September 2022 (WW37)

2022-09-13 Thread Stephen Jolley
Current Dev Position: YP 4.1 M4 (Feature Freeze) Next Deadline: 3rd October 2022 YP 4.1 M4 Build Next Team Meetings: * Bug Triage meeting Thursday September 22nd 7:30 am PDT (

[yocto] Yocto Project Status 04 October 2022 (WW40)

2022-10-04 Thread Stephen Jolley
Current Dev Position: YP 4.1 M4 (In QA) Next Deadline: 28th October 2022 YP 4.1 Release Next Team Meetings: * Bug Triage meeting Thursday October 6th 7:30 am PDT (

[yocto] Enhancements/Bugs closed WW41!

2022-10-11 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count michael.opdenac...@bootlin.com 2 randy.macl...@windriver.com 1 mhalst...@linuxfoundation.org 1 Grand Total 4 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] Current high bug count owners for Yocto Project 4.1

2022-10-11 Thread Stephen Jolley
All, Below is the list as of top 32 bug owners as of the end of WW41 of who have open medium or higher bugs and enhancements against YP 4.1. There are 13 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count ross.bur...@arm.com 17

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-10-11 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] M+ & H bugs with Milestone Movements WW10

2022-10-11 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW41 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 12723 mysql requires unicode and char length filtering

[yocto] Yocto Project Status 11 October 2022 (WW41)

2022-10-11 Thread Stephen Jolley
Current Dev Position: YP 4.1 M4 (In TSC Review) Next Deadline: 28th October 2022 YP 4.1 Release Next Team Meetings: * Bug Triage meeting Thursday October 13th 7:30 am PDT (

[yocto] M+ & H bugs with Milestone Movements WW40

2022-10-03 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW40 are listed below: Priority Bug ID Short Description Changer Owner Was Became Medium+ 14920 oe-selftest-armhost qemu x86-64 kernel NULL pointer dereference in

[yocto] Current high bug count owners for Yocto Project 4.1

2022-10-03 Thread Stephen Jolley
All, Below is the list as of top 33 bug owners as of the end of WW40 of who have open medium or higher bugs and enhancements against YP 4.1. There are 18 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 33

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-10-03 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW40!

2022-10-03 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count ross.bur...@arm.com 2 richard.pur...@linuxfoundation.org 1 chee.yang@intel.com 1 Grand Total 4 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:

[yocto] M+ & H bugs with Milestone Movements WW33

2022-08-15 Thread Stephen Jolley
All, YP M+ or high bugs which moved to a new milestone in WW33 are listed below: Priority Bug ID Short Description High 14800 AB-INT PTEST: libgcrypt ptest intermittent failure Medium+

[yocto] Current high bug count owners for Yocto Project 4.1

2022-08-15 Thread Stephen Jolley
All, Below is the list as of top 35 bug owners as of the end of WW33 of who have open medium or higher bugs and enhancements against YP 4.1. There are 52 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 36

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-08-15 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW33!

2022-08-15 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 2 luca.ceres...@bootlin.com 1 randy.macl...@windriver.com 1 vikkram.r...@in.bosch.com 1 yogesh.ty...@intel.com 1 ahmed.hos...@opensynergy.com 1

[yocto] Current high bug count owners for Yocto Project 4.1

2022-08-08 Thread Stephen Jolley
All, Below is the list as of top 37 bug owners as of the end of WW32 of who have open medium or higher bugs and enhancements against YP 4.1. There are 57 possible work days left until the final release candidates for YP 4.1 needs to be released. Who Count michael.opdenac...@bootlin.com 36

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-08-08 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW32!

2022-08-08 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 1 randy.macl...@windriver.com 1 Grand Total 2 Thanks, Stephen K. Jolley Yocto Project Program Manager *Cell:(208) 244-4460 *

[yocto] Yocto Project Status 16 August 2022 (WW33)

2022-08-16 Thread Stephen Jolley
Current Dev Position: YP 4.1 M3 Next Deadline: 22nd August 2022 YP 4.1 M3 Build Next Team Meetings: * Bug Triage meeting Thursday August 18th 7:30 am PDT (

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-12-26 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Enhancements/Bugs closed WW52!

2022-12-26 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count randy.macl...@windriver.com 2 bruce.ashfi...@gmail.com 1 workjagade...@gmail.com 1 richard.pur...@linuxfoundation.org 1 mingli...@windriver.com 1 Grand Total 6 Thanks, Stephen

[yocto] Current high bug count owners for Yocto Project 4.2

2022-12-26 Thread Stephen Jolley
All, Below is the list as of top 32 bug owners as of the end of WW52 of who have open medium or higher bugs and enhancements against YP 4.2. There are 84 possible work days left until the final release candidates for YP 4.2 needs to be released. Who Count michael.opdenac...@bootlin.com 35

[yocto] Yocto Project Status 20 December 2022 (WW51)

2022-12-20 Thread Stephen Jolley
Current Dev Position: YP 4.2 M2 Next Deadline: 23th January 2023 YP 4.2 M2 Build Next Team Meetings: * Bug Triage meeting Thursday December 22nd 7:30 am PDT (

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2023-01-02 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.2

2023-01-02 Thread Stephen Jolley
All, Below is the list as of top 31 bug owners as of the end of WW01 of who have open medium or higher bugs and enhancements against YP 4.2. There are 79 possible work days left until the final release candidates for YP 4.2 needs to be released. Who Count michael.opdenac...@bootlin.com 35

[yocto] Yocto Project Status 10 January 2023 (WW02)

2023-01-10 Thread Stephen Jolley
Current Dev Position: YP 4.2 M2 Next Deadline: 23rd January 2023 YP 4.2 M2 Build Next Team Meetings: * Bug Triage meeting Thursday January 12th 7:30 am PDT (

[yocto] Yocto Project Status 3 January 2023 (WW01)

2023-01-03 Thread Stephen Jolley
Current Dev Position: YP 4.2 M2 Next Deadline: 23rd January 2023 YP 4.2 M2 Build Next Team Meetings: * Bug Triage meeting Thursday January 5th 7:30 am PDT (

[yocto] Enhancements/Bugs closed WW01!

2023-01-09 Thread Stephen Jolley
All, The below were the owners of enhancements or bugs closed during the last week! Who Count richard.pur...@linuxfoundation.org 2 randy.macl...@windriver.com 1 michael.opdenac...@bootlin.com 1 alexandre.bell...@bootlin.com 1 Grand Total 5 Thanks, Stephen K. Jolley Yocto

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2023-01-09 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

[yocto] Current high bug count owners for Yocto Project 4.2

2023-01-09 Thread Stephen Jolley
All, Below is the list as of top 35 bug owners as of the end of WW01 of who have open medium or higher bugs and enhancements against YP 4.2. There are 76 possible work days left until the final release candidates for YP 4.2 needs to be released. Who Count michael.opdenac...@bootlin.com 34

[yocto] Yocto Project Status 6 December 2022 (WW49)

2022-12-06 Thread Stephen Jolley
Current Dev Position: YP 4.2 M1 Next Deadline: 5th December 2022 YP 4.2 Build Next Team Meetings: * Bug Triage meeting Thursday December 8th 7:30 am PDT (

[yocto] Yocto Project Newcomer & Unassigned Bugs - Help Needed

2022-12-19 Thread Stephen Jolley
All, The triage team is starting to try and collect up and classify bugs which a newcomer to the project would be able to work on in a way which means people can find them. They're being listed on the triage page under the appropriate heading:

<    2   3   4   5   6   7   8   9   10   >