On 4 Nov 2005, at 02:02, Florent Guillaume wrote:
Jens Vagelpohl wrote:
I propose cutting 1.5.5beta this Sunday (November 6th) and having
a beta phase lasting 2 weeks, mostly because I'll be in Detroit
next weekend and probably won't be able to cut a final release.
The weekend after that I'm back in Germany and ready to push out
1.5.5 final.
Please speak up if you don't think this is a good idea.
It's a good idea but maybe would it be worthwhile to have a bug day
before, no? I know there's a few things I want to change to
facilitate Five 1.2/1.3 events working with CMF 1.5.
This brings up a very important point. I was under the impression the
1.5 branch was not going to be sucked into the whole Five/Zope 2.8
juggernaut. That it was not the target for all the new technologies
that are being put on the trunk now. It is supposed to be a
maintenance branch after all, and as such it should not have far-
ranging rearchitecture-style changes.
My own opinion here would be that it is strictly a maintenance
branch. If you're looking for new technologies you should be looking
at the trunk, which will hopefully soon spawn the 2.0 series.
jens
___
Zope-CMF maillist - Zope-CMF@lists.zope.org
http://mail.zope.org/mailman/listinfo/zope-cmf
See http://collector.zope.org/CMF for bug reports and feature requests