tass.com <https://tass.com/economy/1361081>  


Serbia ready to implement pipeline projects with Gazprom - President


2 minutes

  _____  

MOSCOW, November 14. /TASS/. Serbia is ready to continue implementing
interconnector pipeline projects with the Russian gas holding Gazprom,
President Aleksandar Vucic said in interview with the Soloviev Live YouTube
Channel.

"I want that people in Russia know that Serbia successfully resisted
pressure and we have never been a problem: neither when the South Stream was
built [the project was not implemented - TASS] nor when the TurkStream and
the Balkan Stream were built. We constructed the 400-km long gas pipeline
together with Gazprom and gas is already flowing now over the gas pipeline.
We are ready to continue expansion of interconnectors of this gas pipeline
[the TurkStream gas pipeline - TASS] in the region," Vucic said

Serbia is the only European country that has never introduced any sanctions
or measures against Russia, Vucic said. "We have never allowed ourselves
anything that can influence on our relations with Russia," the President of
Serbia added.

On January 1, Vucic gave a start to operation of the Balkan Stream gas
pipeline. The segment in Serbia is the extension of the TurkStream main gas
pipeline delivering Russian gas.

 

-- 
http:www.antic.org
--- 
You received this message because you are subscribed to the Google Groups 
"SERBIAN NEWS NETWORK" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/senet/027b01d7d95b%246f29ca20%244d7d5e60%24%40gmail.com.

Reply via email to