Execution time recorded in recovery log is not correct for 
commit/rollback/savepoints
-------------------------------------------------------------------------------------

         Key: SEQUOIA-869
         URL: https://forge.continuent.org/jira/browse/SEQUOIA-869
     Project: Sequoia
        Type: Bug
  Components: Recovery Log, Core  
    Versions: Sequoia 3.0 beta1, Sequoia 2.10.2    
    Reporter: Emmanuel Cecchet
    Priority: Minor
     Fix For: Sequoia 3.0 beta 2


Execution time recorded in the recovery log for commit/rollback and savepoint 
operations are systematically set to 0.
Appropriate timing should be recorded instead.
Issue reported on the Sequoia mailing list by Ioana Danes <[EMAIL PROTECTED]>

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
   https://forge.continuent.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see:
   http://www.atlassian.com/software/jira


_______________________________________________
Sequoia mailing list
[email protected]
https://forge.continuent.org/mailman/listinfo/sequoia

Reply via email to