I forgot to add, I'm using Sequoia 2.10.5.

Diego escribió:
Hi. I have two Sequoia controllers running a virtual database with one PostgreSQL backend each. I was trying to perform a backup from the administrative console, when I received this message multiple times:

sequoia.controller.scheduler Waiting for 2 open transactions

It turned out that my web app had a bug where two database connections where never closed. The problem is that when that message appeared, all operations where blocked, and subsequent attempts of beginning a transaction failed with this message:

controller.virtualdatabase.inteco Begin failed (Timeout in begin, still waiting for 2 pending transactions to complete)

The bug on my web app is now fixed, but for fear of other bugs that could lead to more unclosed connections, I would like to know if there is a way to perform a forced backup or, even better, a way to specify a timeout after which, if there are still open transactions, cancel the backup attempt. I tried with the "dumpTimeout" option in PostgreSQLPlainTextBackuper with no luck.

Thanks in advance.


_______________________________________________
Sequoia mailing list
[email protected]
https://forge.continuent.org/mailman/listinfo/sequoia

Reply via email to