[ https://forge.continuent.org/jira/browse/SEQUOIA-951?page=all ]
Stephane Giron reopened SEQUOIA-951:
------------------------------------
Assign To: Stephane Giron (was: Mathieu Peltier)
executeUpdate with generated keys can still show the problem.
> Inconcistency between backends of the same controller may take down the 2
> backends at once
> ------------------------------------------------------------------------------------------
>
> Key: SEQUOIA-951
> URL: https://forge.continuent.org/jira/browse/SEQUOIA-951
> Project: Sequoia
> Type: Bug
> Versions: Sequoia 2.10.7
> Reporter: Stephane Giron
> Assignee: Stephane Giron
> Priority: Critical
> Fix For: Sequoia 2.10.8
>
>
> It seems that the way a task is updated by BackendWorkerThreads can lead to
> several backends going disabled, as shown on the following log:
> 2007-05-16 15:20:50,882 ERROR backend.DatabaseBackend.c1b1 Disabling backend
> c1b1 that reports a different number of updated rows (4) than first backend
> to succeed (3) for request update test set i = i+1/
> 2007-05-16 15:21:04,872 ERROR backend.DatabaseBackend.c1b2 Disabling backend
> c1b2 that reports a different number of updated rows (4) than first backend
> to succeed (3) for request update test set i = i+1/
> It seems that it is also possible that the result that is sent back to other
> controller can be wrong : the result that is sent can be the one that was got
> on the disabled backend.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
https://forge.continuent.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira
_______________________________________________
Sequoia mailing list
[email protected]
https://forge.continuent.org/mailman/listinfo/sequoia