Hi Chris,
Just one quick simple comment below.
On 7/29/18 22:05, Chris Plummer wrote:
Hi Gary,
I updated my changes to do the wait() for step, stepi, cont, and
next. Some issues turned up when testing. A number of tests were
timing out occasionally, I believe because sometimes the event
was handled (and the notify() call already completed) before we
ever got to the handler.wait() call.
I agree as I had this exact concern when was looking at the
webrev.0.
Need more time to understand all the details.
Thanks,
Serguei
Although I never confirmed this was
the cause, it certainly seems feasible.
There were also issues with the prompt printed by
TTY:executeCommand(). I've come to realize that it should really
always be printed before any event handling. Currently that
seems to be the case, probably due to the Thread.yield() I
mention below in event handling code like stepEvent(), although
I don't think it's necessarily guaranteed. However, with my
changes prompt was always printed after the event was done being
handled, and this proved to be a problem for some tests.
When executing the "cont" command, it seems this prompt is
expected to be "> ", which is the prompt printed if the VM is
not currently suspended. Some tests count on this, mostly
because they call jdb.receiveReplyFor(), and pass in the number
of prompts that are expected. jdb.receiveReplyFor() does not
count "> ". My change ended up making the printPrompt() in
TTY:executeCommand() print as "main[1]" after a "cont" command,
because the added synchronizing was making it not print until
the thread was suspended. This caused some tests to fail because
the expected reply was not yet received, even after
jdb.receiveReplyFor() had returned (it was basically returning
one prompt too soon).
I started thinking that the synchronized approach probably needs
a large synchronized block in TTY:executeCommand(). But then I
figured out a much easier solution. Thinking more about the
"prompt after cont" issue, it occurred to me that maybe we just
need to print out the prompt before executing the command, so
it's not possible for events to come in before the prompt is
printed (or worse yet, in the middle of event handling output).
Doing this ends up looking much like your original suggestion to
set printPrompt = false for "cont", "step", "stepi", and "next",
except I also added a call printPrompt() before doing this (Dan
an I had rejected your proposal to simply remove the prompt,
since it did server a purpose). For example:
} else if (cmd.equals("cont")) {
MessageOutput.printPrompt();
showPrompt = false;
evaluator.commandCont();
But this does cause the issue I brought up above that the prompt
from "cont" is expected (by a number of tests) to be "> ",
but since the above code is executed while the vm is suspended,
it ends up being main[1]. I fixed this by adding a "simple"
argument to printPrompt() so we can force it to be "> " when
needed. This will maintain compatibility with anyone making
assumptions about what the prompt should look like.
Here's the webrev, which seems to be working. I've run about
1000 iterations on all platforms. So far it seems to be working.
There have been some failures, but for the most part I've also
seen those with clean repos, and the ones that I haven't I don't
believe are related to my changes.
http://cr.openjdk.java.net/~cjplummer/8169718/webrev.01/
One other comment about your initial fix to set showPrompt =
false:
+ showPrompt = false; // asynchronous command
I'm not sure if the "asynchronous command" comment was
intentional or just the result of the copy-and-paste. I just
want to clarify what is meant by "asynchronous command" in the
other places where this comment appears. There are a few
commands that are executed async on a different thread. If you
look in Commands.java, you'll see how these commands use the
AsyncExecution class to handle execution of the command. I'm not
sure why this is done, because all these commands look like ones
that are inherently synchronous, yet they are always run on a
different thread, and as a result may not be complete when
execution returns to TTY::executeCommand(). These commands also
all set showPrompt = false, but the prompt is printed by
AsyncExecution when complete. So, the point is the commands
which are inherently async, like "step" and "cont", are not
async w.r.t. these "asynchronous command" comments or the
AsyncExecution class.
Chris
On 7/27/18 4:27 PM, Chris Plummer wrote:
Hi Gary,
Sorry about the delay in the review. Been trying to fully
understand all the various code flows, which is tricky due to
having the separate event thread whose output needs to be
co-ordinated with command thread. Also made more complicated
by the multiple entrypoints into executeCommand(), and there
being various places where output produced and we care about
the order. I think I have it all mapped out now and a pretty
good understanding of how it all works.
My first impression is that it seems like a large number of
changes and a lot of passing around of a StringBuffer object
to fix a problem which I think could be resolved with some
strategic wait/notify code. For example, it might be as simple
as doing something like this:
http://cr.openjdk.java.net/~cjplummer/8169718/webrev.00/
This only covers the step command. You'd have to figure out
which other commands need to ensure an event has been
processed before printing the prompt, and set
waitForEventCompletion = true for them. Is there a reason not
to go with something like this?
As for you current changes, just a couple of things I've
noticed, but I have not given it a thorough review (for
example, making sure that the StringBuffer is always
eventually printed, and done so in the right order).
In EventHandler.run(), it's unclear who is handling the
printing of sb when handleEvent() or
handleDisconnectedException() are called.
In the following EventHandler code:
123 @Override
124 public void stepEvent(StepEvent se, StringBuilder
sb) {
125 Thread.yield(); // fetch output
126 sb.append(MessageOutput.format("Step
completed:"));
127 }
Do you understand why the Thread.yield() is there? What does
the comment mean by "fetch output"? Just seems like it has
something to do with the ordering of output, but it seems bad
that the code ever relied on a yield to make sure the output
was ordered properly.
Also in the above code snippet, you need to be careful when
replacing MessageOutput.lnprint() with MessageOutput.format().
lnprint() adds a newline to the start of the line. That
appears to be missing in your code above.
thanks,
Chris
On 7/20/18 12:11 PM, Gary Adams wrote:
Here's another attempt to clear up the overlapping output from
the command processing and event handler in the jdb tests.
The fundamental problem is observed when "prompts"
are produced interleaved with command and event output.
This attempts to fix the issue by buffering the output and
printing it fully assembled.
Webrev: http://cr.openjdk.java.net/~gadams/8169718/webrev.01/
On 5/26/18, 6:50 AM, gary.ad...@oracle.com
wrote:
This is a review request for a previously
closed test bug.
The test was recently moved to the open repos, and the
proposed fix is in the open code.
Webrev: http://cr.openjdk.java.net/~gadams/8169718/webrev/
-------- Forwarded Message --------
The jdb tests use stdin to send commands to a jdb process
and parses the stdout to determine if a command was
successful and when the process is prompting for new commands
to be sent.
Some commands are synchronous, so when the command is completed
a new prompt is sent back immediately.
Some commands are asynchronous, so there could be a delay
until a breakpoint is reached. The event handler then sends a prompt
when the application thread is stopped and new jdb commands can be sent.
The problem causing the intermittent failures was a corruption in the
output stream when prompts were being sent at the wrong times.
Instead of receiving
"Breakpoint hit:" <location>
<prompt>
the log contained
"Breakpoint hit:" <prompt> <location>
Once out of sync, jdb commands were being sent prematurely
and the wrong values were being compared against expected behavior.
The simple fix proposed here recognizes that commands like "cont",
"step" and "next" are asynchronous commands and should not send back
a prompt immediately. Instead. the event handler will deliver the next prompt
when the next "Breakpoint hit:" or "Step completed:" state change occurs.
The bulk of the testing was done on windows-x64-debug builds where the
intermittent failures were observed in ~5 in 1000 testruns. The fix has
also been tested on linux-x64-debug, solaris-sparcv9-debug,
and macosx-x64-debug, even though the failures have never been reported
against those platforms.
Failures have been observed in many of the nsk/jdb tests with similar corrupted
output streams, but never directly associated with this issue before.
redefine001, caught_exception002, locals002, eval001, next001,
stop_at003, step002, print002, trace001, step_up001, read001,
clear004, kill001, set001
|