Thanks David!

  I was 'assuming' that somehow I had to specify the eventSource by
name and could find no way to do that since <link /> ( the example I
had anyway ) didn't name the source. However, your response that more
than one data link could be used prompted me to just add another
<link /> to the other spreadsheet and sure enough, it is inserted into
the timeline also. Simple and Perfect :)


On Jan 30, 1:12 am, David Karger <[email protected]> wrote:
> Barry, exhibit is perfectly happy putting two timelines into a single
> page; you just place a separate view tag for each one.  You can include
> more than one data link in an exhibit, thus pulling from multiple
> sources.  Exhibit also has a notion of  "collections"; you can specify a
> certain subset of the data as being part of a collection, and specify
> that a given view (or facet) acts only on one collection of 
> data.http://simile-widgets.org/wiki/Exhibit/Collections
> So, for example if you classify your data as two different types, you
> can place on type in each timeline.
>
> On 1/19/2012 1:47 PM, Barry Berger wrote:
>
>
>
>
>
>
>
> > I'm quite new to using exhibit and timeline. I've played with the
> > examples I've found and was feeling comfortable enough to start my own
> > project but once I identified that project, I ran into a stumbling
> > block quickly. The time line examples show me how to easily use two
> > datasources side by side - which is what I need.....BUT editing the
> > file was a pain so I was overjoyed to see examples of exhibit/timeline
> > using a google spreadsheet.
>
> >  I could find no example of using timeline alone with a google
> > spreadsheet but could also see incentive to make the exhibit/timeline
> > switch. That is perfect BUT all the examples for exhibit/timelin I've
> > found so far use only one datasource and I'm finding the documentation
> > for exhibit and timeline very...difficult to find to see if what I'm
> > trying to do is even option.
>
> > Using the following to identify one eventSource, I'm clueless about
> > how to identify a second one to be used with an additional
> > timelineConstructor ( which is what I'm assuming I need to do for each
> > additional timeline)
>
> > <link
> >        rel="exhibit/data"
> >        type="application/jsonp"
> >        
> > href="https://spreadsheets.google.com/feeds/list/0AhKn5jZugw4YdEwwTVhHSXNjU... <view-source:https://spreadsheets.google.com/feeds/list/0AhKn5jZugw4YdEwwTVhHSXNjU...>"
> >        ex:converter="googleSpreadsheets"/>
>
> > Any pointers would be greatly appreciated.
> >    Barry
>
> > --
> >www.myhomestone.com<http://www.myhomestone.com>
>
> > --
> > You received this message because you are subscribed to the Google
> > Groups "SIMILE Widgets" group.
> > To post to this group, send email to [email protected].
> > To unsubscribe from this group, send email to
> > [email protected].
> > For more options, visit this group at
> >http://groups.google.com/group/simile-widgets?hl=en.

-- 
You received this message because you are subscribed to the Google Groups 
"SIMILE Widgets" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/simile-widgets?hl=en.

Reply via email to