The backfill scheduler will get to the end of the queue if it can do
so in 30 seconds (or whatever you have backfill_interval configured to
be). The sdiag command will report actual scheduler run times. The
"cycle" times are in units of microseconds.
Quoting Martins Innus <min...@buffalo.edu>:
Moe,
On 7/7/15 7:04 PM, Moe Jette wrote:
-- Backfill scheduler: The configured backfill_interval value (default 30
seconds) is now interpreted as a maximum run time for the backfill
scheduler. Once reached, the scheduler will build a new job queue and
start over, even if not all jobs have been tested.
I assume with bf_continue enabled we can still get to the end of the
queue? Or is that not the case?
Martins
--
Morris "Moe" Jette
CTO, SchedMD LLC
Commercial Slurm Development and Support