Would this work:
A maximum number of simultaneously running
tasks from the job array may be specified using a "%" separator.
For example "--array=0-15%4" will limit the number of simultane-
ously running tasks from this job array to 4. The minimum index
value is 0. the maximum value is one less than the configura-
tion parameter MaxArraySize.
Thanks
/David/Bigagli
[email protected]
===============================================================
Slurm User Group Meeting, 15-16 September 2015, Washington D.C.
http://slurm.schedmd.com/slurm_ug_agenda.html
> On 04 Sep 2015, at 20:43, Cooper, Trevor <[email protected]> wrote:
>
>
> The documentation[1] doesn't seem to indicate that there are any controls for
> limiting the number of job array tasks that can be started during each
> scheduler/backfill iteration.
>
> If a user submits multiple jobs with thousands of array tasks each I'd like
> to limit the number of array tasks started from each job to O(10) or O(100).
>
> The SchedulerParameters in slurm.conf[2], for example...
>
> $ scontrol show config | grep Sched
> FastSchedule = 0
> SchedulerParameters =
> batch_sched_delay=30,defer,sched_max_job_start=2,bf_max_job_start=2
> SchedulerPort = 7321
> SchedulerRootFilter = 1
> SchedulerTimeSlice = 30 sec
> SchedulerType = sched/backfill
> SlurmSchedLogFile = /var/log/slurm/slurmsched.log
> SlurmSchedLogLevel = 3
>
> ...seem only to apply to the parent array job and do not control the starting
> of array tasks WITHIN the array job.
>
> Has anybody accomplished something like this successfully and, if so, are you
> willing/able to share your solution?
>
> -- Trevor
>